My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13320
>
2900 - Site Mitigation Program
>
PR0527173
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 10:56:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527173
PE
2950
FACILITY_ID
FA0018402
FACILITY_NAME
ST JOACHIM PARISH
STREET_NUMBER
13320
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01902020
CURRENT_STATUS
01
SITE_LOCATION
13320 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St.Joachim's Parish • • Page 3 of 3 <br /> Our Project Number: E07091A <br /> May 23, 2007 <br /> 3.2 Quality Assurance/Quality Control (QA/QC) Procedures <br /> Quality Assurance/Quality Control (QA/QC) procedures will be used to minimize the potential for <br /> contamination of soil samples. The QA/QC procedures may include the use of single-use <br /> sampling equipment, decontamination of drilling and sampling equipment by washing with a <br /> solution of potable water and Liqui-Nox solution or equivalent between borings, changing latex <br /> protective gloves after each sample, and recording sample information on chain-of-custody <br /> forms. <br /> 3.3 Soil Sample Laboratory Tests <br /> Soil samples will be transported to a California state certified analytical laboratory where the <br /> following Environmental Protection Agency (EPA) tests will be performed: total petroleum <br /> hydrocarbons as gasoline (TPH-g) by 8015M/8021B, total petroleum hydrocarbons as diesel <br /> (TPH-d) by 8015M, and benzene, toluene, ethylbenzene, and toluene (BTEX), oxygenates, and <br /> lead scavengers by 80268. <br /> 4.0 PROPOSED TIME SCHEDULE FOR WORK <br /> Assuming approval of this workplan, we propose to perform the work between May 29 and June <br /> 1, 2007. Standard laboratory turn-around is five business days. We will forward the results of <br /> the work to the EHD within one week of receipt of the laboratory results. <br /> 5.0 REPORT PREPARATION <br /> A letter report will be prepared to present the analytical test results for the soil samples. The <br /> letter report will include laboratory test result sheets and chain-of-custody documentation. <br /> 6.0 LIMITATIONS <br /> The proposed scope of work for the Phase II has been tailored to address the specific issue of <br /> soil impacts from the former leaking underground storage tank site adjacent to the property. If <br /> additional investigation is requested, such investigation will be performed as a separate scope <br /> of work. <br /> 7.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> This workplan has been prepared under the supervision and direction of the undersigned. <br /> NEIL a ANDERSON&ASSOCIATES, INC. Q�pFcSSlO <br /> ti <br /> SD. ROp/ E` <br /> s G <br /> Abigail Mcco, Project Scientist J es Robinson, Sr. `ct X45 <br /> P 69045, PG 7834 Exp. <br /> sr Cl II`N.— <br /> q�OFCAUF "f <br /> 902 Industrial Way•Lodi,CA 95240.209.367.3701 •Fax 209.369.4228 ©2007 Neil O.Anderson&Associates,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.