Laserfiche WebLink
CALCULATED NITROGEN CONCENTRATION TO GROUNDWATER UNDER <br /> LEACFHHLD=13 grams/QAyg+ Qg,,, = 13 g/(2201+ 108) 3.78 x 1000= 11 mg/L NO3-N <br /> C. SEPTIC SYSTEM DESIGN/IMPACT MITIGATION <br /> The design of a future septic system for the facility is based upon the factors of operation, <br /> longevity, and environmental protection. Plumbing fixtures must consist of low volume fixtures <br /> as specified in the Uniform Plumbing Code (UPC). <br /> SEPTIC TANKS <br /> _ The design and performance of future septic tanks for the project are dependent upon the effluent <br /> disposal surface area, discharge rate and exit velocity. These parameters affect the sludge and <br /> scum volumes, and therefore,the nitrogen capacity of the tanks. Tanks with a greater surface <br /> _ area and shallower depth are preferred for surge storage capacity. Waste inflow volume creates a <br /> smaller rise in water depth and a slower discharge rate and exit velocity. These surges of flow <br /> through the tank are dampened as surface area increases. <br /> By using the projected average daily flow volume of 220 gallons,the effective tank capacity is as <br /> follows: <br /> The pump-out interval should he 3 yrs. After three years, a determination can be made as to <br /> sludge and scum formation and wastewater flows to possibly extend this pump-out interval. <br /> Required septic tank capacity: 2.4(QAvF) x Peaking Factor(PF) = 2.4(220) x 1.5 = <br /> 792 gal tank capacity needed. It is assumed the current tank capacity is at least 1000 gallons. <br /> Future septic tank design considerations are discussed under Impact Mitigation. <br /> ilV <br /> LEACBTULDS <br /> Y 'T 1z <br /> Base Tank Capacity (BTC)+Average Daily Flow(ADF) x Soil Factor(S;) <br /> 1,600 gal BTC +220 gal ADF x .200 SF =364 lineal feet of leachline <br /> 4 - 100 foot sections of leachline pipe=4,000 square foot leachfield-7' a <br /> In addition to the leachlines, there should be a minimum of one sump installed for future <br /> expansion. The leachlines should be placed at a depth of 20+ inches below final leachfield <br /> grade. Trench depth should be 36-42 inches. The leachfield trenches and sumps should consists <br /> of the following surface area: Each trench=4 ft'trench sidewalls +2 ft' bottom of trench x 100 <br /> ft length=600 ft' x 4-100 ft sections=2400 ft2. Sumps 4 ft wide x 8 ft deep x 10 ft long=200 <br /> ft'x 2 sumps=400 ft : 2400 ft' +400 ft' =2800 ft' surface area for effluent infiltration. <br /> Several scientific studies have demonstrated that the infiltration capacity of a soil absorption <br /> system is dependant primarily by the formation of the biomat and not by the permeability of the <br /> soil. The biomat is a biological, slimy substance which forms on the soil-effluent interface over <br /> _ time. Hydraulic loading rates range from a conservative criterion of 0.125 gal/ftZ/day to <br /> 0.5 gal/ftZ/day for a percolation rate of approximately 1 min/in. These application rates are based <br /> on trench side wall areas only. <br /> 5 <br /> Vaffey Ag Research <br />