Laserfiche WebLink
COUNTY OF SAN JOAQUIN THOMAS RFLINN <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P. O. BOX 1810-1810 EAST HAZELTON AVENUE MANUEL <br /> DEPUTY DIRECTORECTCP <br /> STOCKTON,CALIFORNIA 95201-1810 STEVEN WINKLER <br /> 209/4683000 DEPUTY DIRECTOR <br /> FAX:209/468-2999 <br /> HENRY M. HIRATA <br /> DIRECTOR r�� C <br /> July 27, 1999 JUL 2 7 1999 <br /> MEMORANDUM COmmunity DevelOpment Dept. <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer G <br /> Public Services Division <br /> SUBJECT: SA-99-57 A SITE APPROVAL APPLICATION TO ADD A 15,140-SQUARE-FOOT <br /> BUILDING WITH AN OFFICE, SIX TRUCK SERVICE BAYS AND A WASH RACK <br /> FACILITY TO AN EXISTING TRUCK REPAIR SHOP FACILITY, LOCATED ON THE <br /> NORTHEAST CORNER OF HARLAN ROAD AND ROTH ROAD. (DISTRICT i). <br /> APPLICANT: Tom Pistacchio APN: 193-330-30 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Harlan Road has an existing right-of-way width of 60 feet and a planned right-of-way width <br /> of 60 feet. Roth Road has an existing right-of-way width of 60 to 70 feet and a planned <br /> right-of-way width of 84 feet. <br /> Harlan Road and Roth do not qualify as Surface Transportation Assistance Act (STAA) routes. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach, unless already paved, shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to issuance of the occupancy <br /> permit. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee currently is $167.96 per <br /> additional daily trip-end generated in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br />