Laserfiche WebLink
z.. <br /> °aqui" APPLICATION =SITE APPROVAL <br /> y SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> e <br /> FILE NUMBER: SA = ® 8 <br /> TO BE COMPLETED BY THE APPLICANT PRIOR TO FILING THE APPLICATION <br /> Owner lnformation Applicant Information <br /> Name: Timothy Grunsky Name: Mike Seley <br /> Address: 1310 W, Charter Way Address: 230 Los Cerros Drive <br /> Stockton, CA 95206 Greenbrae, CA 94904 <br /> Phone: (209)645-5871 Phone: (415) 640-2261 <br /> PROJECT DESCRIPTION _ <br /> Proposal <br /> Description of the proposed project: The proposed project entails setting up and operating a mechanical oil press (and <br /> supporting facility)for extracting corn oil from corn germ. For Phase I, the operation would expect to process 25 tons of <br /> corn germ/day, resulting in approximately 11 tons of corn oil and 14 tons of corn germ meal. For Phase II, this operation is <br /> intended to scale up to a volume of 100 tons of corn germ/day; yielding 44 tons of corn oil and 56 tons of corn germ meal. <br /> The corn oil will be sold to processors to be further refine for either human consumption r jo-diesel; wlk�ereas the corn <br /> germ meal would be sold as a livestock feed ingredient. a ( t d-e _ <br /> Business name (DBA): French Oils, LLC <br /> EmployeeWCustomers pee Work Shift <br /> Shift Hours Days of the week Employees (Number) Customers per Shift Vehicle Trips per Shift <br /> 12:00am— 7 days I week 1.33" .33 (Phase I)** .67 (Phase 1)*** <br /> &00am 1.33 (Phase 11) 2.67 (Phase 11) <br /> &00am— 7 days I week 1.33 .33 (Phase 1) .67 (Phase 1) <br /> 4:00pm 1.33 (Phase II) 2.67 (Phase 11) <br /> 4!00pm— 7 days 1 week 1.33 .33 (Phase 1) .67 (Phase 1) <br /> 12:00am 1.33 (Phase II) 2.67 (Phase 11) <br /> *1 employee per shift, plus a manager who will split time across shifts (no change between Phase I and Phase 11) <br /> **1 customer pickup, per day(Phase 1). For Phase II, this would scale up to 4 customers 1 day(1.33 per shift) <br /> **"2 vehicles, per day(Phase I: 1 supplier drop-off, 1 customer pickup). For Phase 11, this would scale up to 8 vehicles per <br /> day(4 supplier drop-off, 4 customer pickup) <br /> Materials/Equipment Used' <br /> Describe equipment used in the project(include the number of automobiles and trucks): Equipment to be used includes: <br /> (1) Front-Loader <br /> (1) Mechanical expeller array(hopper, auger, dryer, conditioner, expeller, conveyor belt and control panel)-Phase <br /> I. In Phase 11, increase to (4) Mechanical expeller arrays and increase the size of the hopper. <br /> (1) Boiler 1 conditioner array(water tank, boiler, feed water tank, 2 water softeners and a water blow-down tank) <br /> (4) Oil Separation and Storage Tanks- Phase I. In Phase II, increase to (10) Oil Separation and Storage Tanks. <br /> Miscellaneous supplier and customer trucks(none owned 1 operated by French Oils, LLC) <br /> Describe materials produced,stored or used (all hazardous materials should be identified): Materials include: <br /> Com Germ (stored) <br /> Com Oil(produced I stored) <br /> Com Germ Meal(produced/stored) <br /> Fuels(used) <br /> P DEVSM131anning Application FormakSits Approval.(Revised 09-10-08) Page 2 of 9 <br />