My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010905
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
11484
>
2600 - Land Use Program
>
PA-1600105
>
SU0010905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:50 AM
Creation date
9/5/2019 10:58:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010905
PE
2631
FACILITY_NAME
PA-1600105
STREET_NUMBER
11484
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240-
APN
06318009
ENTERED_DATE
5/6/2016 12:00:00 AM
SITE_LOCATION
11484 E HARNEY LN
RECEIVED_DATE
5/6/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARNEY\11484\PA-1600105\SU0010905\APPL.PDF \MIGRATIONS\H\HARNEY\11484\PA-1600105\SU0010905\CDD OK.PDF \MIGRATIONS\H\HARNEY\11484\PA-1600105\SU0010905\EHD COND.PDF \MIGRATIONS\H\HARNEY\11484\PA-1600105\SU0010905\EHD PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1600105 (SA) <br /> Allen <br /> Site Approval application no. PA-1600105 (SA) was approved by the San Joaquin County <br /> Community Development Department on August 22, 2016. The effective date of approval is <br /> September 1, 2016. This approval will expire on March 3, 2018, which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with (2) all <br /> necessary building permits have been issued and remain in force, and (3) all necessary permits <br /> from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, 209-468-8477) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b) APPROVED USE: This approval is for a small winery to be built in two phases over five years as <br /> shown on the site plan dated April 26, 2016. (Use Type:Wineries and Wine Cellars—Winery, Small) <br /> Phase One, with building permits to be issued 18 months from the effective date of approval, <br /> includes the conversion of an existing 3,200 square foot agricultural storage building into a <br /> fermentation and barrel storage room and to utilize an existing 1,750 square foot concrete pad as <br /> a crush pad. Phase Two, with building permits to be issued five years from the effective date of <br /> approval, is for the conversion of an existing 1,190 square foot residence into a wine tasting <br /> room. No marketing events are proposed or approved with this application. <br /> c) PRODUCTION CAPACITY: A small winery shall have a minimum production capacity of 201 <br /> gallons of wine per year and a maximum production capacity of 36,000 gallons of wine per year. <br /> (Development Title Section 9-1075.5[a]). <br /> d) CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> e) PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All winery driveways and maneuvering areas shall be surfaced and permanently maintained <br /> with base material of appropriate depth and chip seal to provide a durable, dust free surface. <br /> Bumper guards shall be provided when necessary to protect adjacent structures or properties <br /> (Development Title Section 9-1015.5[e]). <br /> 2) A minimum of 11 parking spaces shall be provided, including one van accessible space, at <br /> full buildout. A minimum of 8 parking spaces shall be provided in Phase One. A minimum of <br /> 3 parking spaces shall be provided in Phase Two. 2.5 parking spaces are required for every <br /> 1,000 square feet of building area.)(Development Title Section 9-1015.3) <br /> PA-1600105 (SA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.