Laserfiche WebLink
USE PERMIT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE,STOCKTON CA 95205 <br /> BUSINESS R OINIE: (209)-468-312" <br /> 9r;FOR�` Business Hours: 8:00 a.m.to 5 00`p.m. (Monday,throth Frtday) <br /> PAM-J t11 �, �s .0 <br /> STi=P:i GHEK VMIITIH STAFF Devefoprrent Services Staff wilt explain the requirements.and procetlures to you <br /> STEP2 SUi3M1T YOUR APPLICATION When yorJ apply,file all of the following. <br /> • The staff waif let you know ttie current cost of filing an appltcat'*:Make checks payable to the San Joaquin <br /> County Treasurer <br /> FSI M <br /> isuen�( errs te+ + ppl'a(ton nformation forms attached which:ail owners must sign. <br /> ...�� { ) . <br /> ��P'. <br /> • Y - x ' _� _. <br /> �� i e o#sa „ed ite: I attached}and two(2)copies of a legitzle$-112",x site plan: <br />} arfS- One copy.bf.a=completed Hazardous Materials Dis6iosure survey form a co of the form I$attached). <br /> ;5 Y { pY <br /> • DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection-to public facilities,you must submit a"will-serve"letter from the appropriate <br /> water,sewer and drainage entities at the'6rrie of filing_ This tetter must include a statement-from the agency <br /> that they will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> • APPLICATION Staff will cheek your application. If anything.is missing,you will be notified in writing. The applicant will be <br /> COMPLE=TE sent a postcard once the application has been determined complete. (Your-application cannot be processed <br /> until.it is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will'decide if the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review <br /> will be required. Projects that have the potential to adversely affect the environment will require the <br /> - preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property owners <br /> kP4 <br /> TION affected by your proposal. At the end of a review and comment period a staff report will be prepared and the <br /> Planning Commission will hold a public hearing. If the Commission can make the required findings,the <br /> application will be approved. Typically action will be taken by the Commission within 8 weeks after <br />' application. <br /> F <br /> CTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action is finalunless a ealed. For further inforrr►ation on the len th of thea eal eriod,contact the staff. <br /> CONDITIONS AND ADDITIONAL PERMITS <br /> ONS --The staff will send you the final action and if it is approved, it will list conditions,by department,that must be <br /> met before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage,grading,frontage improvements,access,on-and off-site service and utility <br /> facilities,landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Pen-nits must be acquired from the Public Works Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> I <br /> • SANITATION& Projects that will utilize,new on-site sanitation disposal and/or on-site wells,must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Use Permit application. <br /> BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> f • OTHER Frequently other local,state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g.Air Pollution Control District, Regional Water Quality Control Board or the Sheriff's Office). The <br /> Community Development Department will identify additional permits we are aware of that may be required for <br /> our ro•ect_ <br /> FADEVSVC1Pianning Application FonmslUse Permit.(Revised 1-2-o3) Page 1 of 9 <br /> i <br />