Laserfiche WebLink
11. P?ease include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. See Attachments. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a. Water Supply: On-site well <br /> b. Sewage Disposal: On-site septic system <br /> C. Storm Drainage: Drainage ditches <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : <br /> d. Natural Gas : N/A <br /> e. Electricity: from PG&E transmission line <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name) : <br /> Entrance of A.C. to vehicle scale <br /> g. Fire: Linden StatiorDistance to nearest fire station: 6 miles <br /> h. Schools: N/A <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> The proposed preliminary design over a 36 year site life includes 9 million <br /> CY of excavation. Portions of the natural stream on-site will be re-route-T.- <br /> -(See <br /> (See Attachment 1) <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Six diesel heavy equipment machines and two smaller trucks. <br /> Types of emissions and sources associated with project Internal <br /> t combustion engine emissions, minor dust, possibly landfill gas. <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project Diesel fuel for operations will be approximately <br /> 4000 gallons per month. <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> 300 Acres which is currently used for grazing land. <br /> Irrigated Not irrigated 300 Acres <br /> Use Permit Application - 9 - ( 6/86 ) <br />