Laserfiche WebLink
UI � <br /> r' <br /> T THOMAS M.GAU - P.O.BOT 1819ON,CALIFORNIAE. 95 AVENUE <br /> DIRECTOR 0TOCKTON,CFORNIA <br /> (209)4683000 FAX(209)468-2999 <br /> A ��� <br /> �gtii=on�'�P• m % www.sjgay.org/pubworks <br /> FRITL BUCHMAN - Working for YOU <br /> DEPUTY DIRECTOR <br /> MICHAEL SELLING <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> October 31, 2011 <br /> MEMORANDUM <br /> TO: John L.Fµnderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON:Mo Hatef <br /> FROM: Alex Chetley,Engineer V <br /> Public Services Division <br /> SUBJECT: PA-1100160;A Use Permit application to convert an existing off-site wine cellar into a medium-sized <br /> winery to be completed in four phases over a fifteen-year period. Phase One,to be completed in 18 <br /> months,shall include the reconditioning of an existing 800 square-foot patio cover and the construction <br /> of a 516 square-foot wine tasting room expansion to an existing off-site wine cellar building and crush <br /> pad. Phase Two,to be completed in five years, shall include the construction of a 20,000 square-foot <br /> processing and storage building. Phase Three,to be completed in ten years, shall include the <br /> construction of a 20,000 square-foot barrel storage building. Phase Four,to be completed in fifteen <br /> years,shall include the construction of a 20,000 square-foot barrel storage building. Thirty-seven(37) <br /> Marketing Events per year are also proposed,which increases the previously-approved twenty-four <br /> (24)marketing events for the existing off-site wine cellar by thirteen(13)marketing events.The <br /> project site is located on the north side of Harney Lane approximately one-quarter mile west of Alpine <br /> Road,east of Lodi. (Supervisorial District 5) <br /> PROPERTY OWNER: Lawrence&Charlene Mettler APPLICANT: Mettler Family Vineyards <br /> ADDRESS: 7889 E.Harney Lane,Lodi APN: 061-133-28 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Harney Lane has an existing right-of-way width of 60 feet and a planned right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> I. The access gate shall be kept open during hours of operation. <br />