Laserfiche WebLink
APPLICATION - USE PERMIT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: UP- <br /> Existing Roads <br /> Road/Street Name R.O W Width Pavement Width Curb/Gutter Sidewalks <br /> Harney Lane <br /> Yes ❑ No❑ Yes ❑ No <br /> Yes ❑ No ❑ Yes ❑ No ❑ <br /> Surface Transportation Assistance Act(STAA)trucks <br /> Will STAA type trucks, over California Legal length, be used as part of the proposed operation? <br /> Yes ❑ (if yes, the applicant must provide a letter requesting designation of the proposed facility as an STAA temtinal.) <br /> No <br /> ENVIRONMENTAL INFORMATION <br /> (USE ADDITIONAL PAPER, IF NECESSARY) <br /> Water, Drainage and Flooding <br /> Describe any areas subject to flooding (include flood depths and flood panel map number): <br /> NIA— Property is outside the 100 year flood plain <br /> Describe the current depth of the ground water and depth to potable water: <br /> Approximately 250' to 350' <br /> Describe any existing drainage courses or eroded areas on or near the project site (e.g. rivers, creeks, swales or drainage ditches): <br /> NIA—no rivers, creeks. swales or drainage ditches <br /> Land, Land Use and Biota <br /> Describe the site's topography (e.g. land forms, slopes. etc.): <br /> The property is basically flat—very little change in elevation <br /> Describe agricultural land that will be lost as a result of the project (type of crops, acres, quality of soil, etc.) <br /> Approximately 4 acres of vineyard will be removed. <br /> Describe any wildlife habitat on-site and species that are of may be present: <br /> NIA— no wildlife habitat is present on the property <br /> Describe any vegetation on-site by type and extent: <br /> Crape Myrtle, Italian Cypress, American Sycamore, Birch trees, and several types of Evergreen trees. <br /> Air Quality <br /> Describe air pollutants that may result from the project (e.g. construction related dust, vehicle trips per day, fire places, incinerators, <br /> etc.). <br /> All roads for construction are paved and the project is in the center of 23 acres, dust will be contained on site. <br /> Phase#1 will have a construction period of 4 to 6 months with an average of four trips per day(construction vehicles). <br /> F 1DEVSVCW1anning Application Formswse Permit (Revised 02-03-10) Page 4 of 9 <br />