My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011684
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
9010
>
2600 - Land Use Program
>
PA-0700440
>
SU0011684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:20 AM
Creation date
9/5/2019 11:02:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011684
PE
2656
FACILITY_NAME
PA-0700440
STREET_NUMBER
9010
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240-
APN
06308001
ENTERED_DATE
2/27/2018 12:00:00 AM
SITE_LOCATION
9010 E HARNEY LN
RECEIVED_DATE
2/27/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARNEY\9010\PA-0700440\SU0011684\APPL.PDF \MIGRATIONS\H\HARNEY\9010\PA-0700440\SU0011684\CDD OK.PDF \MIGRATIONS\H\HARNEY\9010\PA-0700440\SU0011684\EH PERM.PDF \MIGRATIONS\H\HARNEY\9010\PA-0700440\SU0011684\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA -0700440 (SA -RAA) - 2 - 24 May 2018 <br />Harney Lane Winery Project <br />San Joaquin County <br />the United States Environmental Protection Agency (USEPA). Basin Plan amendments <br />only become effective after they have been approved by the OAL and in some cases, the <br />USEPA. Every three (3) years, a review of the Basin Plan is completed that assesses the <br />appropriateness of existing standards and evaluates and prioritizes Basin Planning issues. <br />For more information on the Water Quarty Control Plan for the Sacramento and San <br />Joaquin River Basins, please visit our website: <br />http://www.waterboards. ca.gov/centralva lley/water_issues/basin_plans/. <br />Antidegradation Considerations <br />All wastewater discharges must comply with the Antidegradation Policy (State Water Board <br />Resolution 68-16) and the Antidegradation Implementation Policy contained in the Basin <br />Plan. The Antidegradation Policy is available on page IV -15.01 at: <br />http://www.waterboards. ca. gov/centralval leywater_issues/basin_plans/sacsj r.pdf <br />In part it states: <br />Any discharge of waste to high quality waters must apply best practicable treatment or <br />control not only to prevent a condition of pollution or nuisance from occurring, but also to <br />maintain the highest water quality possible consistent with the maximum benefit to the <br />people -of the State. <br />This information must be presented as an analysis of the impacts and potential impacts <br />of the discharge on water quality, as measured by background concentrations and <br />applicable water quality objectives. <br />The antidegradation analysis is a mandatory element in the National Pollutant Discharge <br />Elimination System and land discharge Waste Discharge Requirements (WDRs) permitting <br />processes. The environmental review document should evaluate potential impacts to both <br />surface and groundwater quality. <br />II. Permitting Requirements <br />Construction Storm Water General Permit <br />Dischargers whose project disturb one or more acres of soil or where projects disturb less <br />than one acre but are part of a larger common plan of development that in total disturbs <br />one or more acres, are required to obtain coverage under the General Permit for Storm <br />Water Discharges Associated with Construction Activities (Construction General Permit), <br />Construction General Permit Order No. 2009-009-DWQ. Construction activity subject to <br />this permit includes clearing, grading, grubbing, disturbances to the ground, such as <br />stockpiling, or excavation, but does not include regular maintenance activities performed to <br />restore the original line, grade, or capacity of the facility. The Construction General Permit <br />requires the development and implementation of a Storm Water Pollution Prevention Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.