Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS TO DEVELOPMENT <br /> SA-00-85 <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee currently is <br /> $458 per 1,000 gross square foot of building as Office. The fee shall be automatically <br /> increased on January 1 of each year through the year 2005 at the rate of 7.66 percent. <br /> A credit may be allowed if it can be verified that the existing development on this site was <br /> in operation on or after April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> 7. The project shall be served by a public sewer collection system constructed in <br /> conformance with the requirements of the San Joaquin County Public Health Services <br /> Environmental Services Division and the Department of Public Works. <br /> (Development Title Section 9-1105.2) <br /> 8. The project shall be served by a public water system conforming to the requirements of <br /> the San Joaquin County Public Health Services Environmental Health Division and the <br /> Department of Public Works. <br /> (Development Title Section 9-1115.2) <br /> GK:SH:mr <br /> PS-0A6 -MIA <br /> E: Thomas M. Gau, Deputy Director/Development <br />