Laserfiche WebLink
4� `s SAN JOAQUIN COUNTY <br /> z ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone:(209)468-3420 Fax: (209)464-0138 Web:wwwsjgov.org/ehd <br /> ��FORr. <br /> SURFACE AND SUBSURFACE CONTAMINATION REPORT REQUIREMENT CHECKLIST <br /> F <br /> ITE LOCATION: '.\\ ` ` o C PA#: 0 7 <br /> I ��'Vb N�2e��nw �I'�' L-S�OIi� REPORTDATE: <br /> = sufficient <br /> I Insufficient <br /> San Joaquin County Development Title Chapter 9-905, Section 9-905.12 <br /> = <br /> S I 1.0 INTRODUCTION & PROPOSED DEVELOPMENT SECTION ) <br /> ❑ 1.1 Des�nptioni�f site(report must address all parcels), including current and/or proposed zoning information. <br /> ( <br /> �} ❑ 1.2 Description of proposed developmerff�� <br /> ® ❑ 1.3 Parcel location <br /> 71 ❑ 1.4 Site map showing location of all items on parcel. (Examples:structures,drives,wells,septic systems, large trees, <br /> pastures,pools, natural drainage courses,ponds,waterways, etc.) CA-1,�'1 <br /> 2.0 PAST, PRESENT AND PROPOSED FUTURE USES OF THE SITE SECTION <br /> 0- ❑ 2.1 Discussion of past, present and proposed future uses at the site to assess potential problems. (Example sources <br /> of information:current and/or previous property owners, historical maps, insurance maps, previous land use <br /> applications, et _) Ca L)3 ) A j,(, �f ) Av t—) <br /> 3.0 IDENTIFICATION OF ALL PAST AND CURRENT SOURCES OF CONTAMINATION <br /> ❑ 3.1 Discussions of the methods used to research and investigate the potential or known above and belowground <br /> sources of contamination at the project site. (Examples: Dal a�search, EHD records searchpppagricultur 1 <br /> chemical application search, site reconnaissance and survey,et ��'j ) t, fj 6 $ 0 s <br /> ❑ 3.2 Description of all past on-site potential and/or known above and low ground sources of contamination identified <br /> at the project site. (Examples: Agricultural chemical handling/storage/use, aboveground/underground tanks, <br /> septic systems,injection wells,unsled wells,ponds/lagoons,vehicle/machine repair/painting, buried or <br /> stockpiled solid waste,etc.) ( ) <br /> ❑ 3.3 Description of all current on-sjteotential and/or k wn�ve and below ground sources of contamination <br /> identified at the project site(see examples above) �C <br /> ❑ 3.4 Description of all past off-site potential and/or known above and below ground sources of contamination identified <br /> in the area of the project site that has or may impact the project site. (Examples: Close proximity to a former <br /> landfill/former gasoline station, in area of known DBCP/Nitrate groundwater impact,etc.) 66 <br /> ® ❑ 3.5 Description of all current off-site potential and/or known above and below ground sources of contamination <br /> identified in the area of the project site. (r <br /> 4.0 EVALUATION OF PAST AND CURRENT SOURCES OF CONTAMINATION IDENTIFIED <br /> AT OR NEAR THE SITE AND RECOMMENDATIONS FOR FURTHER ACTION <br /> ❑ 4.1 Evaluation of each potential and/or known source of contamination identified (in the above section)for any real <br /> and/or potential threat to human health and the environment. This evaluation should take into consideration the <br /> proposed future uses of the project parcel. l� <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS SECTIONrt;7- <br /> 2L ❑ 5.1 Discussion of the above evaluation to either rule out each source as a real or potential threat or to recommend <br /> further action to mitigate or abate any real or potential threats identified. Recommendations may include <br /> additional site assessment(i.e.collection of soil/water samples)and/or mitigative measures(i.e.,clean up of <br /> surface wastes). All recommendations for future work must include a time frame for implementation $ <br /> ❑ 5.2 The report was inclusive (i.e. all information referenced was included in this report—report should not reference <br /> other reports). <br /> ❑ 5.3 The report was signed, dated and stamped by a qualified environmental professional. <br /> ❑ 5.4 The report was prepared within six months of the date of the submittal of the land use application. <br /> Jg_-_ ❑ 5.5 The attachments/appendic suffici mentation to support claims made in report. <br /> Reviewed B Reviewed Date: <br /> ERD 2601 Pa Surface&Sub checklist <br />