Laserfiche WebLink
• I I <br /> YES NO <br /> Other sources used: <br /> 7 . Hazards : <br /> a . Will the project create a risk of <br /> explosion; release, generate or <br /> store any hazardous substances ; or <br /> cause other dangers to public health <br /> and safety? <br /> b . Are there_ any known hazardous <br /> substances located within 500 feet of <br /> the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible <br /> groundwater contamination) ? C <br /> C. Will the project result in <br /> interference with, or need for, <br /> emergency plans? <br /> Other sources used: �n44'4w Ad-z�la !/ilayl <br /> 8 . Utilities and Public Service: <br /> ** a . Will the project require alteration of , <br /> addition to, or the need for new u.:ility <br /> systems (water, sewer, drainage, solid <br /> waste) , including a Sphere of Influence <br /> or district boundary change? <br /> ** b. Will the project result in the <br /> need for or the expansion of the <br /> fol_cwing services: fire and police <br /> protection, schools , parks and <br /> recreation, libraries, roads, flood <br /> control , solid waste or other public <br /> works facilities, public transit, or <br /> governmental services? <br /> C. Will the project adversely impact <br /> existing recreational/park <br /> opportunities or require new <br /> park/recreation opportunities? X <br /> Note: "Yes" answers to these two questions and 9 (b) below <br /> will require additional discussion, but do not necessarll} <br /> indicate a potentially significant impact. <br /> Initial Study (Rev: 01/91) <br /> -20- - <br />