Laserfiche WebLink
APPENDIX A MOUNTAIN HOUSE NEIGHBORHOODS KAND L INITIAL STUDY <br /> Person) Timing or <br /> Monitoring Agency Frequency of <br /> Impact Mitigation Measure Requirements Responsibleb Monitoring- <br /> c) <br /> oni torinc)The wastewater treatment and storage ponds located within the 100-year Floodplain shall Review pond design. SJCBD DP <br /> be set back from existing food control levees to not interfere with inspection,maintenance, <br /> or repair of the food control levees,if applicable. <br /> d)The wastewater treatment and storage pond levees shall be set back an appropriate Review pond design. SJCBD DP <br /> distance from existing food control levees to ensure that there will be no loss of integrity of <br /> the food control levees. <br /> M4.4.2-5 a)No sewage treatment facilities for Mountain House,including storage ponds,and no Review of plan. SJCCDD SP <br /> The direct application of reclaimed water for areas for disposal of sewage effluent or sewage sludge shall be located in the Delta <br /> irrigating crops in the Primary Zone of the Delta Primary Zone,as defined by Public Resources Code 29728. <br /> (Fabian Tract)could have a detrimental or <br /> limiting effect on the variety of crops that can be <br /> produced.The construction of storage ponds for <br /> reclaimed water could have a detrimental effect <br /> on delta islands with their peat soils and high <br /> ground water levels. <br /> STORM DRAINAGE <br /> M4.4.3.1 a)Any proposed plans for construction or grading which include a detention basin shall Review Operations SJCBD DP <br /> The accumulation of floating debris and Include a proposed schedule and description of necessary routine maintenance activities and Maintenance <br /> petroleum residual in detention ponds could for such detention basin(s)(including access roads). The maintenance plans may be in the Manual. <br /> create a nuisance condition(e.g.,odors, form of a general operations and maintenance manual or may be specific to the detention <br /> mosquito infestation,and excessive algae basin(s)for which constructionigrading plans are being submitted. <br /> growth)and cause adverse aesthetic effects. <br /> GAS AND ELECTRICITY <br /> 4.4.4.1 a)Construction plans shall be submitted to PG&E and other easement owners for review Documentation from SJCCDD C in applicable <br /> The Master Plan does not provide specifications prior to construction in applicable specific plan areas.In particular,the construction plans PG&E areas <br /> for moving existing utilities and establishing should identify proposed land uses In utility easements,and procedures for movement of <br /> easements, heavy machinery over pipelines installed in non-roadway areas which may not be designed <br /> to withstand forces exerted by heavy loads. <br /> 0 vzvr j <br />