Laserfiche WebLink
S = Sufficient <br /> I = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ® ❑ 6.1 Site map shol?g the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> ❑ ❑ 6.2 The minimumpumber of shallow and deep percolation tests was performed for each parcel. <br /> 4 ❑ 6.3 Description of the date,time and protocol used to prepare the test hole,including depth and dimensions of hole, <br /> preparation of hole,and depth of water used to presoak(minimum 12 inches). <br /> G <br /> ❑ 6.4 Description of the date,time and condition of the test hole after the 24-hour soak period(hole still intact, hole dry, <br /> depth to water remaining in hole,etc.) <br /> ® El 65 <br /> 6.5 The test conformed to SJC Policy EHD 02-02(correct depth,diameter,2"gravel,6"water refill, correct readings <br /> recorded). <br /> ❑ 6.6 Complete Percolation Test Form (including readings)was provided with RENS verification signature. The rate <br /> was correctly calculated using the last reading. , (r. 3 0- <br /> 6.7 <br /> 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> E 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed B `� <br /> Y� '� ,� --- Reviewed Date: <br /> i <br /> I <br /> 1 <br /> EHD 26-42-003 Page 2 of 3 Snil Suitability Checklist <br /> 911 A PIRA2 <br />