d. DEWATERING PERMIT: The proponent may be required to file a Dewatering Permit covered under <br /> WDR's General Order for Dewatering and Other Low Threat Discharges to Surface Water Permit, <br /> Order No. 5-00-175 (NPDES CAG995001). The following discharges may be covered by this permit <br /> provided they do not contain significant quantities of pollutants and are either(1)four months or less <br /> in duration, or(2) the average dry weather discharge does not exceed 0.25 million gallons per day <br /> (mgd): <br /> (1) Well development water. <br /> (2) Construction dewatering. <br /> (3) Pump/well testing. <br /> (4) Pipeline/tank pressure testing. <br /> (5) Pipeline/tank flushing or dewatering. <br /> (6) Condensate discharges. <br /> (7) Water supply system discharges. <br /> (8) Miscellaneous dewatering/low threat discharges. <br /> Conditions of Approval - 7 - PA-0400250 <br />