My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011364
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENRY
>
22469
>
2600 - Land Use Program
>
PA-0400250
>
SU0011364
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:07 AM
Creation date
9/5/2019 11:15:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011364
PE
2605
FACILITY_NAME
PA-0400250
STREET_NUMBER
22469
Direction
S
STREET_NAME
HENRY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24905017
ENTERED_DATE
5/23/2017 12:00:00 AM
SITE_LOCATION
22469 S HENRY RD
RECEIVED_DATE
5/22/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENRY\22469\PA-0400250\SU0011364\APPL.PDF \MIGRATIONS\H\HENRY\22469\PA-0400250\SU0011364\CDD OK.PDF \MIGRATIONS\H\HENRY\22469\PA-0400250\SU0011364\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CONDITIONS OF APPROVAL <br /> PA-0400250(QX, RAA) <br /> REED LEADING GROUP, LLC/GEORGE REED, INC. <br /> Revisions of Approved Actions application for previously approved Quarry Excavation application <br /> No. PA-0400250 was approved by the Planning Commission on June 15, 2017. The effective date of <br /> approval is June 26, 2017. This approval will expire on December 31, 2031, unless (1) all Conditions <br /> of Approval have been complied with, (2) all necessary building permits have been issued and <br /> remain in force, and (3) all necessary permits from other agencies have been issued and remain in <br /> force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Giuseppe Sanfilippo, [209]468-0227) <br /> a. APPROVED USE: This approval is for a Quarry Excavation to remove approximately one million <br /> cubic yards of rock, sand, and gravel from approximately 56 acres in three phases over a period <br /> of 26 42 years as shown on the site plan dated June 10, 2005 and the amended reclamation plan <br /> dated September 110 March 16, 2017. All materials shall be processed at an existing facility <br /> (QX-89-0002). The excavation process shall be completed by DeGember 41, 2015 December 31, <br /> 2029. The site shall be fully reclaimed by DeGeFR136=31, '017 December 31. 2031 <br /> b. STOCKPILING: No stockpiled soil or material shall be placed closer than twenty-five (25) feet to a <br /> property boundary. (Development Title Section 9-1415.3[b]) <br /> c. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> d. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> e. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours from 5:00 <br /> a.m. to 9:00 p.m. (Development Title Section 9-1415.3[f]) <br /> f. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> permit. (Development Title Section 9-1415.3[g]) <br /> g. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1415.3[h]) <br /> h. HEALTH CONSIDERATIONS: This quarry excavation shall: <br /> (1) Not cause health or sanitary hazards and shall not crate conditions which will cause the <br /> breeding or increase of mosquitoes, rodents, or other pests. <br /> (2) Provide hand washing facilities on or near the approved toilets. (Development Title Section 9- <br /> 1415.3[I]) <br /> PA-0400250 Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.