Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> THOMAS & MARY RAMPOLDI <br /> MS-91-17 <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to the approval of the Parcel Map. <br /> 1. DEPARTMENT OF PUBLIC WORKS <br /> ORDINANCE REQUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements are not appealable. <br /> a. A Parcel Map is required. <br /> b. The Traffic Impact Mitigation Fee will be required for this <br /> subdivision. The fee is due and payable at the time of the <br /> building permit application. (The fee is $2 , 018 . 00 for each <br /> single family dwelling unit in the Escalon area. The fee <br /> shall be automatically adjusted annually by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record. ) <br /> 2 . PUBLIC HEALTH SERVICES <br /> ORDINANCE REQUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements are not appealable. <br /> a. A soil suitability study as required by Section 10100 of the <br /> San Joaquin County Development Code must be preformed <br /> indicating that the area is suitable for septic tank usage. <br /> A permit for the percolation test is required from the <br /> Environmental Health Division. <br /> b. Construct an individual sewage disposal system under a permit <br /> and inspection by the Environmental Health Division at the <br /> time of development. <br /> C. Construction of an individual domestic water well under a well <br /> permit and inspection by the Environmental Health Division at <br /> the time of development. <br />