Laserfiche WebLink
S = Sufficient <br /> I = Insufficient - n <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION_ndcYcy� 6. 6 B <br /> [/ El 6.1 Site map showing the location,with concise and accurate dimensions of the percolation test holes'do t e parcel.<� <br /> [� F16.2 The minimum number of shallow and deep percolation tests was performed for each parcel�5 9— <br /> ❑ 6.3 Description of the date,time and protocol used to prepare the test hole, including depth and dimensions of\hole, <br /> preparation of hole, and depth of water used to ppr5?ak(minimum 12 inches). <br /> E( ❑ 6.4 Description of the date,time and condition ofath2 test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole,etc.) nn � <br /> 13, El 6.5 The test conformed to SJC Policy EHD 02-02 (co rCrct depth, diameter, 2"gravel,6"water refill, correct readings <br /> recorded). N '�- <br /> IJ ❑ 6.6 Complete Percolation Test Form (including readings)was provided with EHSCv-erification signature. The rate <br /> was correctly calculated using the last reading. A--e > r <br /> d. ❑ 6.7 Discussion of any potential problems predicted and/or the need fo�an engineered or alternative septic system. <br /> ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> t` ' co <br /> 7.0 CONCLUSION SECTION <br /> � <br /> Q/ ❑ 7.1 The report was signed and stamped by the appropriately registered individual ; 3 <br /> Reviewed By: � s '//'%�� Reviewed Date: Z -3 of <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />