My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012239
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOGAN
>
4920
>
2600 - Land Use Program
>
PA-1900054
>
SU0012239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:41 AM
Creation date
9/5/2019 11:17:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012239
PE
2690
FACILITY_NAME
PA-1900054
STREET_NUMBER
4920
Direction
E
STREET_NAME
HOGAN
STREET_TYPE
LN
City
LODI
Zip
95240-
APN
06108008, 06108019
ENTERED_DATE
3/19/2019 12:00:00 AM
SITE_LOCATION
4920 E HOGAN LN
RECEIVED_DATE
3/22/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOGAN\4920\PA-1900054\SU0012239\APPL.PDF \MIGRATIONS\H\HOGAN\4920\PA-1900054\SU0012239\CDD OK.PDF \MIGRATIONS\H\HOGAN\4920\PA-1900054\SU0012239\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & Electric Company` <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California.Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.