My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011318 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
2600 - Land Use Program
>
PA-1700072
>
SU0011318 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:05 AM
Creation date
9/5/2019 11:18:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011318
PE
2633
FACILITY_NAME
PA-1700072
STREET_NUMBER
20500
Direction
S
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95304-
APN
21216010
ENTERED_DATE
4/17/2017 12:00:00 AM
SITE_LOCATION
20500 S HOLLY DR
RECEIVED_DATE
4/17/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOLLY\20500\PA-1700072\SU0011318\SS_NL STUDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. SEPTIC TANKS <br /> Septic tanks store accumulated sludge, scum and effluent(clear zone)volumes, which in turn <br /> affect treatment of nitrogen within the tanks. Detention time will be individually calculated for <br /> the two new tanks to be installed, and demonstrates that when the Max ADF is applied to each <br /> tank,there remains sufficient detention time: <br /> Detention Time Calculation for the two new septic tanks: <br /> Detention Time=22,000 gai tank capacity x 0.70 (30%volume lost to sludge/scum accumulation) <br /> 2.5 (Peaking factor)x 512 MAX gals/day(ADF) <br /> Detention Time= 1,200 gal tank capacity x 0.95 (5%volume lost to sludge/scum accumulation) <br /> 2.5 (Peaking factor)x 512 MAX gals/day(ADF) <br /> Detention Time= 1.0 days for the 2,000 gal tank and 0.9 days for the 1,200 gal tanks to be installed. <br /> The minimum acceptable detention time is 1.0 day. Although the 1,200 gallon tank has a slightly lower <br /> acceptable detention time,this is acceptable. <br /> C. PRESSURIZED FILTER BED SIZING CALCULATIONS <br /> Base Tank Capacity(BTC)= 1,200 gal. Leachline Equivalent Requirement= 1,200 gallons BTC <br /> +512 ADF x 0.250 clay Soil Factor(SF) =428 lineal feet of leachline (LFLL) required. 428 x 4 <br /> (Clay Soil - Filter Bed Soil Factor) = 1,712 ftZ filter bed area required. <br /> The Acceptance Rate was determined to be 0.190 gallons/ftZ/day. Taking a max ADF of 512 <br /> gals/day_ 0.190 gals/ft2/day=2,695 ftZ filter bed area required. The primary filter bed design <br /> area is 39 ft N-S and 57 ft E-W= 2,223 ftZ. The total (both primary and replacement) disposal <br /> area is constrained by a fence to the south, a concrete walkway to the east, an asphalt driveway to <br /> the west and a concrete foundation to the north. <br /> D. DESIGN AND OPERATIONAL SPECIFICATIONS OF THE PRESSURIZED <br /> DISPOSAL SYSTEM <br /> Pump Chamber to Filter Beds: The second compartment of the 1,200 gallon tank will be the <br /> pump, or dosing chamber for the filter bed. Orenco BioTube®ProPackage Filter Pump Vault <br /> PN: PVU57-1819 with Duplex Effluent Pump System: PN: PF5005, '/2 HP, 50 gpm, 115 Volt <br /> contained within BioTube Pump Vault. Total effluent volume can be calculated by checking <br /> pump cycle times on the panel and also to ensure both pumps are distributing effluent equally. <br /> Pressurized effluent to travel in Sch. 80 PVC 2.0" dia. <br /> Laterals for the Filter Bed: Sch. 40 PVC 2.0" dia., 1/8" orifice directed at 12 o'clock with orifice <br /> shields, 5.0 ft spacing and 39 ft long. Install clean-outs at the end of each lateral and at the end of <br /> manifold, and to be contained within Christy boxes. <br /> Page -9- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.