Laserfiche WebLink
B. SEPTIC TANKS <br /> Septic tanks store accumulated sludge, scum and effluent(clear zone) volumes, which in turn j <br /> affect treatment of nitrogen within the tanks. Detention time will be individually calculated for <br /> the two new tanks to be installed, and demonstrates that when the Max ADF is applied to each <br /> tank, there remains sufficient detention time: <br /> Detention Time Calculation for the two new septic tanks: <br /> Detention Time=2,000 gal tank capacity x 0.70(30%volume lost to sludge/scum accumulation) <br /> 2.5 (Peaking factor)x 512 MAX gals/day(ADF) <br /> Detention Time= 1,200 gal tank capacity x 0.95 (5%volume lost to sludge/scum accumulation) <br /> 2.5 (Peaking factor)x 512 MAX gals/day(ADF) <br /> Detention Time= 1.0 days for the 2,000 gal tank and 0.9 days for the 1,200 gal tanks to be installed. <br /> The minimum acceptable detention time is 1.0 day. Although the 1,200 gallon tank has a slightly lower <br /> acceptable detention time,this is acceptable. <br /> C. PRESSURIZED FILTER BED SIZING CALCULATIONS <br /> Base Tank Capacity(BTC) = 1,200 gal. Leachline Equivalent Requirement= 1,200 gallons BTC <br /> + 512 ADF x 0.250 clay Soil Factor(SF) =428 lineal feet of leachline (LFLL) required. 428 x 4 <br /> (Clay Soil - Filter Bed Soil Factor)= 1_,712 ft'- filter bed area required. <br /> The Acceptance Rate was determined to be 0.190 gal lons/ftZ/day. Taking a max ADF of 512 <br /> gals/day- 0.190 gals/ft'-/day=205 ft'- filter bed area required. The primary filter bed design <br /> area is 39 ft N-S and 57 ft E-W= 2,223 ft'-. The total (both primary and replacement) disposal <br /> area is constrained by a fence to the south, a concrete walkway to the east, an asphalt driveway to <br /> the west and a concrete foundation to the north. <br /> D. DESIGN AND OPERATIONAL SPECIFICATIONS OF THE PRESSURIZED <br /> DISPOSAL SYSTEM <br /> Pump Chamber to Filter Beds: The second compartment of the 1,200 gallon tank will be the <br /> pump,or dosing chamber for the filter bed. Orenco BioTube® ProPackage Filter Pump Vault <br /> PN: PVU57-1819 with Duplex Effluent Pump System: PN: PF5005, Y: HP,50 gpm, 115 Volt <br /> contained within BioTube Pump Vault. Total effluent volume can be calculated by checking <br /> pump cycle times on the panel and also to ensure both pumps are distributing effluent equally. <br /> Pressurized effluent to travel in Sch. 80 PVC 2.0" dia. <br /> Laterals for the Filter Bed: Sch. 40 PVC 2.0" dia., 1/8" orifice directed at 12 o'clock with orifice <br /> shields, 5.0 ft spacing and 39 ft long. Install clean-outs at the end of each lateral and at the end of <br /> manifold, and to be contained within Christy boxes. <br /> Page -9- <br />