My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003982
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOMESTEAD
>
24205
>
2600 - Land Use Program
>
MS-01-44
>
SU0003982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:28 AM
Creation date
9/5/2019 11:18:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003982
PE
2622
FACILITY_NAME
MS-01-44
STREET_NUMBER
24205
STREET_NAME
HOMESTEAD
STREET_TYPE
LN
City
ACAMPO
ENTERED_DATE
5/11/2004 12:00:00 AM
SITE_LOCATION
24205 HOMESTEAD LN
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOMESTEAD\24205\MS-01-44\SU0003982\APPL.PDF \MIGRATIONS\H\HOMESTEAD\24205\MS-01-44\SU0003982\CDD OK.PDF \MIGRATIONS\H\HOMESTEAD\24205\MS-01-44\SU0003982\EH COND.PDF \MIGRATIONS\H\HOMESTEAD\24205\MS-01-44\SU0003982\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jennifer Jolley, Associate Planner; Mike Smith, Engineer, and Kay & Joseph Berghold, were present for <br /> this item. <br /> Ms. Jolley introduced the project. Ms. Jolley reviewed the Development Committee memo. <br /> Mr. Neely reviewed the Department of Public Works requirements. <br /> Mr. Borges reviewed Environmental Health Division requirements. Mr. Borges advised the applicants to <br /> obtain discharge requirements from the California Regional Water Quality Control Board, Central Valley <br /> Region, prior to development. <br /> Mr. Smith asked if it would be okay to plant olive trees in the 5' of County road right-of-way, with the <br /> understanding that when the County needs to widen the road, the applicants will remove the trees. Mr. <br /> Neely indicated that it would be okay to plant trees, but no structures. <br /> Mr.Martin asked Ms. Jolley to indicate in the conditions of approval that there will be no access to the <br /> winery off of Highway 12. <br /> Mr. Martin asked Mr. &Mrs. Berghold if they would be opposed to recording a document stating that, in <br /> the event that the parcels are sold separately, the non-winery property would include an easement for <br /> access to the winery from Cherry Road. The Bergholds indicated that would be fine. <br /> 1:30 p.m. 7. USE PERMIT APPLICATION NO. PA-0200001 OF CALAVERAS <br /> .IF MATERIALS,INC. (CIO IAN WIEBENGA). A Use Permit application for a <br /> New concrete batch plant facility to consist of Batch Plant apparatus, 1920 <br /> square foot office/driver lounge, and 280 square foot batch office. Located on <br /> the west side of Mac Arthur Road, 1200' south of Linne Road, south of Tracy <br /> (APN: 253-120-12; 28983 s. Mac Arthur Drive, Tracy). <br /> Jeff Fisher, Associated Planner, Ian Wiebenga, Project Manager/Calaveras Materials, Inc., and Terry <br /> Travis, Operations Manager/Calaveras Materials, Inc., were present for this item. <br /> Mr. Jeff Fisher introduced the project. Mr. Fisher reviewed the Development Committee memo. <br /> Mr. Wiebenga indicated that they have another batch plant in Tracy, and when the new batch plants opens <br /> they plan to close the old plant. Mr. Wiebenga asked if it was possible to transferring traffic fees. Mr. <br /> Neely indicated no. <br /> Mr. Martin asked the applicants if they would be bringing in a revised Site Plan before the Planning <br /> Commission hearing. Mr.Wiebenga indicated yes. <br /> Mr. Martin informed the applicants that they could complete the parking area for trucks in phases,over a <br /> five-year period. Mr. Martin reviewed the parking requirements item f.1. <br /> Mr.Neely reviewed the Department of Public Works requirements. Options were discussed for traffic, <br /> parking, and paving issues. <br /> Mr. Martin indicated that the applicants would need to show on the Improvement Plan a circulation lane <br /> and parking for how many trucks the company will be starting with, and show the additional parking <br />
The URL can be used to link to this page
Your browser does not support the video tag.