My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
3500 - Local Oversight Program
>
PR0544809
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 12:32:27 PM
Creation date
9/5/2019 11:32:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544809
PE
3526
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CvvATC <br /> A S S O C I A T E S I N C <br /> Sample Analysis <br /> Selected soil samples will be immediately placed on ice and delivered under chain-of-custody <br /> documentation to a State-certified laboratory for analysis. Samples will be analyzed for total <br /> petroleum hydrocarbons as gasoline (TPHg, EPA Method 8015), and for volatile organic <br /> compounds (VOCs, EPA Method 8260B) including oxygenate fuel additives. <br /> Groundwater Sampling <br /> Groundwater samples collected from all borings will be submitted using chain-of-custody record <br /> to a State-certified laboratory. Groundwater samples will be analyzed for total petroleum <br /> hydrocarbons as gasoline (TPHg, EPA Method 8015), and for volatile organic compounds <br /> (VOCs, EPA Method 8260B) including oxygenate fuel additives. <br /> Report Preparation <br /> Upon completion of the subsurface investigation activities, a summary report will be prepared for <br /> submittal to the EHD. The report will include a description of all field activities, laboratory <br /> analytical results, and boring logs. Additionally, the report will include revised lateral and <br /> vertical extents of hydrocarbons in soil and groundwater and revised mass of contamination <br /> calculations. Based on these results and current quarterly monitoring results for the existing <br /> wells, ATC will evaluate potential remedial alternatives and associated pilot testing, and the need <br /> for additional monitoring wells at the site. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) and Quality Control/Quality Assurance Plan on file with the EHD. <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities. ATC <br /> will notify the EHD at least 48 hours prior to beginning any field activities. The summary report <br /> will be submitted to EHD approximately four to five weeks after the completion of field <br /> activities. <br /> wAI4885\repons\wkpin.doc 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.