Laserfiche WebLink
ATC SITE SAFETY PLAN <br /> WORK PLAN <br /> Task One: <br /> Supervise the installation of three soil borings to an estimated depth of <br /> approximately 95 feet. The borings will be converted into 2-inch diameter <br /> groundwater monitoring wells. At least two soil samples will be collected from the <br /> boring from areas which exhibit physical indications of contamination or significant <br /> changes in lithology. Samples will be analyzed for BTEX (EPA Method 8020), <br /> TPHg (EPA Method 8015 Modified), oxygenate fuel additives (EPA Method 8260), <br /> and total lead. <br /> Task Two: <br /> Develop and sample newly installed monitoring wells MW 1, MW2, and MW3. <br /> Additionally the site's existing water supply well will be sampled. <br /> PAGE 5 <br />