Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME Q �� PROJECT NUMBERS 1'q 78S OQO WELL NOW <br /> PROJECT MANAGER TYPE OF WELL. ✓Monitoring Extraction Other <br /> RECORDED BY Air SAMPLED BY DATE 0/0 0-A* <br /> WELLS PURGING' INFORMATION <br /> PURGE VOLUME PUR�EETHOC <br /> Well r <br /> Idsing❑lameter '1J <br /> 2-Inch 44neh Other Bader - Type <br /> Well Total Depth (Fj�feet below Top of Casing,TD Pump - Type <br /> Other - Specify <br /> Depth to Water ` 90 feet below Top of Casing,WL Hydrocarbon Odors <br /> lln <br /> Water Column Length3A()feet Yes No <br /> Purge Volume Calculation (Water Column Length x Multipller x No Volumes = Calculated Purge Volume) <br /> 0 X Or X - - r+ Calculated Purge Volume gallons <br /> (WCL} (Multiplier) (No Volumes) Actual Purge Volume = allons <br /> atdpller:C89t ❑�atrtett'E° Rnehesl GallonsftearfoaL'; 4#tC.56 a�11-5 S A'ze 4 <br /> Groundwater Parameter Measurement: Meter Type 50-d Calibrated es_No <br /> TIME ELAPSE❑ FLOWRATE DTW ply EC TEME TURBIDITY REDOX COMMENTS <br /> TIME (GPAA} (ft) anhesfam X-C (NTu) mV <br /> qac 0. S-1. :/9 17"Q NA Arlor <br /> 93 ela e..�^ '7- O Z6 Ugs !' rvf.�iS�. <br /> 60 <br /> eZ t 88' ► l <br /> VAMASSOCIATES INC. <br /> F mnoNMENTAL,aWTECNMCAL AND&rATWUL5 PRCFt5raflAL3 <br />