11-03-2001 Gea3Wv, LLC-Wel!Abandonment for Mwwan Page 2 of 2 <br /> Proposed,Field Procedures <br /> The abandonment of groundwater monitoring wells MWA, MW-2, and MW-3 will be <br /> performed by a C-57 licensed driller under the supervision of a State Certified <br /> Hydrogeologist (See Figure 1 for Well Locations). <br /> Prior to pressure grouting the wells, the depth to groundwater will be sounded to verify <br /> that the water levels are consistent with past readings and the total depth of each well's <br /> casing will be measured, in order to verify that no debris or obstructions are present in <br /> the well casing. If obstruction are present, they will be removed prior to pressure <br /> grouting and over drilling. Each well will then abandoned in-place, beginning at a depth <br /> of 98 feet bgs, by utilizing a tremie pipe with a sealing packer at its end to maintain <br /> pressure while pumping Portland Type 1111 cement mixed with approximately 5% <br /> bentonite grout (neat cement into the sand filter pack of the well). Pressure grouting will <br /> then be continued until a sufficient amount of cement has been pumped to ensure <br /> sealing of the sand filter pack and filling of the well casing so that the perched aquifer <br /> zone (i.e. between 80 and 82 feet bgs) and the top of the sand pack (i.e. @ 75 feet bgs) is <br /> sealed off from the deepest contaminated soil at a depth of 60 feet bgs (See Figure 2 for <br /> Cross Section). <br /> After the wells are pressure grouted from 98 feet bgs to 75 feet bgs, the grout will be <br /> allowed to set for a minimum of 72 hours. After the grout has set, each of the three wells <br /> will be over drilled with a hollow-stem auger through the bentonite seal (i.e. between 72 <br /> and 75 feet bgs)to 75 feet bgs, during which time, the old well casing and associated <br /> well construction materials will be removed. After each well has been cleaned out to 75 <br /> feet bgs, they will be grouted utilizing a tremie pipe with a sealing packer at its end to <br /> maintain pressure while pumping Portland Type 1/11 cement mixed with approximately 5% <br /> bentonite grout to within 3.5 feet of ground surface. The remaining 3 1/2feet will then be <br /> sealed with concrete and covered with AC pavement to match the surrounding <br /> pavement. Pressure grouting of the sand pack is recommended so that the process of <br /> over drilling will not cross contaminate the shallow gasoline contaminated soil zone with <br /> the deeper perched groundwater zone. <br /> The drill cuttings and decontamination water generated during abandonment activities <br /> will be stored on site in sealed Department-of-Transportation (DOT)-approved, 55-gallon <br /> metal drums to be transported to a legal point of disposal. <br /> After the wells have been properly abandoned, a well abandonment report, detailing the <br /> well abandonment process completed will be submitted to the County for review and <br /> approval. <br /> LIMITATIONS <br /> This report has been prepared in accordance with generally accepted environmental, <br /> geological and engineering practices. No warranty, either expressed or implied, is made <br /> as to the professional advice presented herein. The analyses, conclusions and <br /> recommendations contained in this report are based upon site conditions as they <br /> existed at the time of the investigation and they are subject to change. The conclusions <br /> presented in this report are professional opinions based solely upon visual observations <br /> made within individual soil excavations and of the site and vicinity as well as on <br /> interpretations of available information as designated in this report. GeoSoly, LLC, <br /> maintains that the limited scope of services performed in the execution of this <br /> investigation may not be sufficient to satisfy the needs, and/or requirements of all <br /> regulatory agencies or other users. Any use or reuse of this document, its findings, its <br /> conclusions and/or recommendations presented herein, is done so at the sole risk of the <br /> said user. <br /> 11-03-2001 GeoSoty, LLC-- Welt Abandonment for Nunan Page 2 of 2 <br />