Laserfiche WebLink
Ronald Nunan i '. ..a. /MAY 17 2001 <br /> 2= J <br /> 4; / <br /> investigative workplan/Corrective Action Plan (CAP)before <br /> performing.any,work.. This phasing process <br /> and the workplan/CAP requirements were intended to: s <br /> 1, help the responsible party undertake the necessary corrective action ina cost-effective, efficient and. <br /> timely manner; <br /> 2, enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund.will only reimburse the most cost-.effective`corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary-to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessaryto mitigate a demonstrat4immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake , <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action;and; (2) <br /> complying with any requirements that the regulatory agency may set: Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard:Implementing interim <br /> remedialaction does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and-Cost Preanproval• Only corrective action costs required by the regulatory agency to ; <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or a.ivaiver of the three bid:. <br /> requirement, reimbursement is not assured and costs may be rejected,as ineligible. ., s <br /> If you have any questions,please contact me at(916)341-5681 ,3;, <br /> Sincerely, <br /> Sandy Gill _ { <br /> Claims Review Unit <br /> Underground Storage Tank CIeanup Fund p <br /> cc: Mr. Gordon Boggs Ms.:Margaret Lagorio r <br /> RWQCB, Reg. 5 - Sacramento '. San7oaquin County..EHD <br /> 3443 Routier Road P.O;Box 2009„ i <br /> Sacramento, CA 9582773098 "` Stockton, CA 95201 <br /> �ealifornia.En virooinental Protection Agent v <br /> ��Recyc%dPbpec <br />