Laserfiche WebLink
SECOR <br /> HEALTH AND SAFETY PLAN <br /> REVIEW AND APPROVAL <br /> CLIENT: Ms. Anne D. Wilkinson SITE NAME: Jackpot,Food Mart <br /> PROJECT NAME: Time Oil - Lockeford PROJECT NUMBER: 70005-001-02 <br /> START DATE: June 0$, 1999 END DATE: June 08. 2000 <br /> PLAN EXPIRATION DATE: Max to June Q8- 2000 (revise then) <br /> (Last day of expected field work or no longer than I year months). <br /> Todd I Brown Signature: Date: <br /> Plan Completed By <br /> John_ Bower Signatur . Date: 1 OSUt�(9� <br /> Project Manager / <br /> James W..Grasty Signature: Date: <br /> Health & Safety Coordinator <br /> Todd I Brown Signature: �%' Date: <br /> Site Health and Safety Officer <br /> Joseph Hunt Signature: Date: <br /> Corporate Health and Safety <br /> This Health and Safety Plan has been written for the use of SECOR and its employees. It may also be used <br /> as a guidance document by properly trained and experienced SECOR subcontractors. However, SECOR <br /> does not guarantee the health or safety of any person entering this site. <br /> Due to the potential hazardous nature of this site and the activity occurring thereon, it is not possible to <br /> discover, evaluate, and provide protection for all possible hazards which may be encountered. Strict <br /> adherence to the health and safety guidelines set forth herein will reduce, but not eliminate, the potential <br /> for injury at this site. The health and safety guidelines in this Plan were prepared specifically for this site <br /> and should not be used on any other site without prior research by trained health and safety specialists. <br /> SECOR claims no responsibility for its use by others. The Plan is written for the specific site conditions, <br /> purposes, dates, and personnel specified and must be amended if these conditions change. <br />