My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 1:05:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIME OIL- LOCKEFORD, CA SECOR Project No._5005-001-02, <br /> II. GENERAL SITE REQUIREMENTS AND BACKGROUND INFORMATION <br /> A. Health and Safety Plan Responsibilities <br /> • Prior to beginning on-site work, the Project Manager will ensure Attachments 1--4 are completed. <br /> + The Site Health and Safety Officer (SHSO) will ensure Attachments 5-8 are completed the first day of on- <br /> site work. Within 24 hours of the end of field work, the SHSO will submit the completed HASP to the <br /> Health & Safety Coordinator (HSC). <br /> • The Site Health and Safety Officer will oversee the overall Plan. He/she has the authority to stop work <br /> or prohibit any personnel from working on the site at any time for not complying with any aspect of the <br /> Plan. <br /> • The Subcontractor Field Supervisor is responsible for implementing the Plan for his/her own employees. <br /> • Each person on the site has responsibility for their own health and safety, as well as assisting others in <br /> carrying out the Plan. Any person observed to be in violation of the Plan should be assisted in complying <br /> with the Plan, or reported to the Site Health and Safety Officer or the Subcontractor Field Supervisor. <br /> • Any site personnel may shut down field activities if there is a real or perceived immediate danger to Iife <br /> or health. <br /> B. Minimum Training, Respirator Ft-Testing, and Medical Surveillance Requirements for Site Personnel <br /> • 40 hr. Hazardous Waste Operations Training (HAZWOPER) <br /> • 8 hr. Annual HAZWOPER Refresher Training <br /> • 8 hr. Supervisor HAZWOPER Training for Site Health and Safety Officer <br /> • First Aid and CPR Training for Site Health and Safety Officer <br /> • Annual Respirator Fit Testing <br /> • Annual Medical Clearance <br /> C. Purpose of Field Work: <br /> Installation;Cimundwater Monitoring and Samplijag.-Well sparge/YES <br /> D. Detailed Description of Specific Tasks Planned (Number each separate task in order of progression. The task <br /> numbers assigned here will be referred to throughout the Plan): <br /> 1. <br /> 2. MJ1Installation <br /> 3. Installation of SVE & urge System <br /> 4. Qperation and Maintance of SVE & Sparge Remediation System, <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.