My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 1:05:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u i <br /> TIME OIL - LOCKEFORD, CA SECOR Project No.jCt(}05-001-p2 <br /> V. GENERAL SITE HEALTH AND SAFETY PROCEDURES r <br /> A. MAPS-Site Map and Hospital Location Map (p. iii and p. ii): Hospital route must be clearly marked. POST <br /> SITE AND HOSPITAL LOCATION MAPS. <br /> B. Post "Local Emergency and Project Telephone Numbers";'p. 1 <br /> C. . Site Security: Site Health and Safety Officer is responsible for preventing unauthorized entry onto the site and <br /> for knowing who is on-site at all times. ! <br /> 1. Work will be done around heavy equipment (e.g. drill rig, backhoe, etc.): <br /> (YES/NO):. YES <br /> • i <br /> If YES, describer nQi <br /> -Will be used to Qonduct feasibility teging or install-the rernediation system. <br /> 2. •-Work will be done in or adjacent to a road,-street or highway: <br /> YESINO _ NO <br /> If YES, describe: <br /> 3. Reflective vests will be worn around heavy equipment or when working in or around traffic. <br /> 4. Prior to working on-site, a general inspection for hazards will be made by the Site Health and Safety <br /> Officer., <br /> I <br /> 5. Access to the work site will be controlled in the following manner: <br /> • Work site area perimeter identification method (describe equipment and procedures to be used): <br /> A <br /> -Barricades and Caution tape will be used when required to definQ work zone. <br /> • Work area security (on- and off-hours): <br /> NIA <br /> 6. If an on-site command post is necessary, ensure that it is located upwind from sources, give prevailing <br /> winds, and locate/identify on Site Map (p. iii). <br /> 7. On-site personnel must be able to call off-site via a telephone within 150 feet of work. <br /> 8. Designate at least one vehicle for emergency use. <br /> _10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.