Laserfiche WebLink
Project TIME OIL CO 14000 E HWY 88-- Loekeford Log of Boring/Monitoring well Page 1 of 3 <br /> Boring Location In Grass 10' West of Propane Tank Project No N0005--001-01 MW- 5 ( SB-- <br /> S B 1_- 1 1 <br /> 1 <br /> Subcontractor and Equipment Geo - Environmental Logged By Bartee l �7 <br /> Sampling Method 2 1 D Split Spoon Monitoring Device PID Comments <br /> ' Start Date/Time 12/27/94//0725 Finish Date/Time 12/27/94//1835 8-Inch DiameterHollow <br /> Stem Augers <br /> First Mater (BGS) NA Stabilized Water Level (BGS) NA <br /> Surface Elevation NA Casing Top Elevation NA <br /> A13 Boring Abandonment/ <br /> k a LITHOLOGIC DESCRIPTION well Construction Details <br /> 11 m r v (color grain size consistency moisture other) <br /> T <br /> a <br /> 0 <br /> 1 n <br /> n <br /> 2 n NOTE NO SPLIT SPOON SOIL SAMPLES COLLLECTED FROM <br /> ' 0 TO 25 FEET BELOW GROUND SURFACE BORING <br /> 3 n LOGGED FROM DRILL CUTTINGS FOR THIS INTERVAL <br /> n <br /> 4 <br /> n <br /> n <br /> 6 n <br /> ' 7 n <br /> g n FINE SAND, MODERATE YELLOWISH BROWN (IOYR 5/4) <br /> n MOIST NO PETROLEUM ODOR <br /> n <br /> ' 9 SW <br /> 10 <br /> PORTLAND <br /> 11 ^ CEMENT <br /> GROUT <br /> 12 <br /> 13—\ n <br /> n <br /> 14 <br /> 15 n <br /> n <br /> 1 <br /> 16 <br /> n <br /> 17 n <br /> n <br /> n <br /> 19 /� <br /> n <br /> 2O n <br /> 21 n <br /> 22- ^ - <br /> n <br /> 23 ^ - <br /> 24 <br /> n i <br /> ' 25- n <br /> � n � <br /> 26 <br /> 27 -� <br /> ZB- <br /> 29 <br /> n t <br /> �— JU - - - — - - _ --_ - - - - -- <br /> Reviewed bti Date <br /> SE C O R Revised b� — Dat r --- _ - - <br />