Laserfiche WebLink
Project TIME OIL COMPANY -- 14000 Highway 88, Lockeford Log of Boring/Monitoring well Page 2 of 2 <br /> ' goring Location NW Entry Off HWY 88 Project No N0005-001--01 SB -6 <br /> Simco <br /> ubcontractor and Equipment GEO-- Environmental 248USK-I Logged Br Bower <br /> ' ampling Method 2 1 D Split Spoon Monitoring Device Model 5808 OVM Comments <br /> 6' Outside Diameter <br /> Start Date/Time 12/2/93//1640 Finish Date/Time 12/2/93//1815 Hollow-Stem Augers <br /> First Water (BCS) NA Stabilized Water Level (BGS) NA <br /> ' C= <br /> Tr-E12 <br /> Surface Elevation Casing Top ElevationA WLITHOLOGIC DESCRIPTION Boring Abandonment/ <br /> ell Construction Details <br /> a (color grain size consistency moisture other) <br /> 30 <br /> 8 <br /> 26 0 31 CLAYEY SILT, MODERATE YELLOWISHBROWN <br /> — —T <br /> (10YR 5/4), VERY STIFF DRY, NO <br /> ' 32 ML PETROLEUM ODOR <br /> 33 <br /> a <br /> 34 t7 <br /> ' _ = SAND, FINE TO MEDIUM GRAINED, YELLOWISH GRAY, <br /> 22 35 - 00 <br /> (5Y 7/2), VERY DENSE DRY, NO PETROLEUM <br /> n 38 036 ODOR V <br /> � 36 - _ A <br /> 37 -Yyy \ <br /> SP <br /> 38 0 <br /> R. <br /> ' <br /> 39—: = _ <br /> _ 40 <br /> Y 11 <br /> ' 16 0 41 <br /> 20 END Of BORING 415 FEET <br /> 42 <br /> 43 <br /> ' 44 <br /> 45 <br /> ' 48 <br /> 47 <br /> ' 48 <br /> 49 <br /> ' SO <br /> 1 <br /> SEACO^j[.�V Reviewed by Date <br /> ' Revised by Date <br />