Laserfiche WebLink
3 <br /> 2 Q SITE PREPARATION ACTIVITIES <br /> 2 1 Permitting <br /> Prior to drilling, a soil boring and well permit was issued for the Site by the County <br /> EHD A County EHD inspector was on the Site during field activities to witness <br /> ' proper seal placement on the wells and the proper backfilling of the borings Several <br /> changes to the scope of work, which were verbally approved by the on-site County <br /> EHD representative, were made during the field investigation These changes are <br /> discussed in Section 4 1 <br /> 2 2 Utility Clearance <br /> Utility locations were marked by Cruz Brothers Sub-Surface Utility locators prior to soil <br /> gas sampling and the placement of borings <br /> ' W W 634%REPORTSISITE AMLOCKEFORONLOCKEFORO RPT (April 26 19931 CSriOn1@hI wi o 11 1 el ltdl <br />