My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007101
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:18 AM
Creation date
9/5/2019 1:33:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007101
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> d' <br /> Site History <br />. 14000 Highway 88,Lockeford CA <br /> Time Oil Property No 04-049 <br /> 1 Advancing 4 borings to a depth of 40 feet (or to 10 feet past any indications of contamination) <br /> 2 Collecting soil samples from each boring at 5-foot intervals and submitting them for analyses <br /> based on visual observation and field Instrumentation readings <br /> 3 Installing two 2-inch diameter vapor extraction Inlet wells use in a future remediation system <br /> Authorization to proceed with the assessment was received from the PHS/EHD on November 26, 1993 <br /> Additional Sall Investigation - December 1993 <br /> On December 2 and 3, 1993, a mobile drill rig was used to advance three soil borings and Install two <br /> vapor extraction wells in the vicinity of the former tank system During field activities, soils were found to <br /> consist of fine silty sands, sandy silts, or clayey silts to approximately 15 feet below ground surface, this <br /> strata was underlain by fine to coarse sands to a depth of approximately 30 feet Clayey silt was <br /> generally encountered at 30 feet to 35 feet, while fine to coarse sands were encountered from 35 feet to <br /> the extent of the borings Groundwater was not encountered during field activities <br /> Borings SB-6 and SB-7 were advanced to a depth of 41 5 feet below ground surface, while SB-9 was <br /> advanced to 56 5 feet Wells W-7 and W-8 were Installed to a total depth of 56 6 feet, and constructed <br /> with 2-inch diameter PVC casing and 0 020 inch slotted well screen Both wells were screened from a <br /> depth of 25 feet below ground surface to the extent of the wells <br /> Based on visual inspection and field instrumentation, 3 to 4 soil samples from each boring were <br /> submitted to a laboratory and analyzed for TPH-g and BTEX One sample from each boring was also <br /> analyzed for total lead and EDB None of the soil samples were found to contain detectable <br /> concentrations of TPH-g, with the exception of those collected from W-8 (7,900 ppm at 20 feet, 1,400 <br /> ppm at 45 feet, and 1,700 ppm at 55 feet) Toluene (up to 120 ppm), ethylbenzene (up to 110 ppm), and <br /> xylenes (up to 700 ppm) were also present in the samples collected from W-8 Residual concentrations <br /> of BTEX and total lead were present In several samples collected from SB-7, W-7(SB-8), and SB-9, <br /> however, these did not appear to be present at concentrations of concern EDB was not indicated in any <br /> of the samples <br /> A copy of SECOR's "Environmental Site Assessment Report" dated June 14, 1994, was forwarded to the <br /> appropriate regulatory agencies on June 22, 1994 In their reply dated July 7, 1994, the PHS/EHD <br /> agreed with the conclusions of the report and requested that a workplan for the installation of additional <br /> soil borings and/or vapor extraction wells be submitted <br /> Workplan for Additional Soil Investigation -August 1994 <br /> Based on the data collected during previous investigations, it appeared that the lateral extent of <br /> hydrocarbon-impacted soil had been defined to the northwest (by W-5 and SB-6), west (by SB-4), <br /> southwest (by SB-7 and W-7), south (by W-6), and east (by SB-9) of the former tank system However, <br /> it was not defined to the north and northeast On August 30, 1994, SECOR's "Workplan for Additional <br /> Environmental Investigation" was forwarded to the appropriate regulatory agencies The workplan <br /> proposed these activities <br /> 1 Three borings would be advanced to a depth of 65 feet (or to 10 feet past any Indications of <br /> contamination) <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.