My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007105
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:18 AM
Creation date
9/5/2019 1:33:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007105
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to approximately I foot above the screened interval A sanitary seal consisting of 2 feet of hydrated <br /> bentonite chips will be placed on top of the gravel pack, and bentonite cement slurry will fill the <br /> remaining annulus to surface grade The monitor well will be completed at surface grade with a water <br /> tight traffic-rated street box set in cement, and a water tight, locking well cap A typical groundwater <br /> monitor well construction diagram is shown on Figure 5 <br /> 45 Monitor Well Development_.and Surveying <br /> After installation, the monitor wells will be checked for floating liquid hydrocarbon by lowering a clean <br /> teflon bailer down the well and collecting a sample at the groundwater interface If the well contains <br /> floating liquid hydrocarbon it will not be developed Wells not containing floating liquid hydrocarbon <br /> will be developed by using a surge block and PVC bailer to alternately surge the screened portion of <br /> the well bore and purge the sediment laden water Development will continue until five to ten well <br /> volumes of groundwater have been removed, and/or the water produced is relatively sediment free <br /> For each morutor well installed at the site, the top of casing of the completed groundwater monitor <br /> wells will then be surveyed to a baseline datum and accurately located on a site map by a licensed <br /> professional surveyor <br /> 46 Groundwater Monitoring and Sampling <br /> A depth-to-groundwater measurement will be obtained from the groundwater monitor wells using a <br /> water level indicator graduated to 0 01 foot The depth to groundwater measurement will be converted <br /> to a groundwater elevation for the well If liquid hydrocarbons are present the well(s) will not be <br />' purged and sampled <br /> Following the check for liquid hydrocarbons, each well will be purged by hand bailing or pumping at <br /> least four weH volumes, or until the well goes dry After allowing the water level in the monitor well <br /> to recover to at least 80 percent of its static level, groundwater samples will be collected using a clean <br /> teflon bailer and subsequently be decanted in laboratory supplied sample vessels Samples will be <br /> tightly capped with zero headspace, then labelled with the sample number, sample time and date, and <br /> immediately placed on ice in an insulated cooler The sample will be logged onto a Chain-of-Custody <br /> 055LO1_XWPLL 9£COA <br /> 6 <br /> NOOPS-00]-0] Jy9 LIZ <br /> v <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.