My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007116
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:18 AM
Creation date
9/5/2019 1:34:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007116
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrective Action Plan 13 <br /> 4 ime Oil Company Property No 04-049 14000 East Highway 88 Locl.eford CA September 8 1998 <br /> 4.0 EVALUATION OF REMEDIATION ALTERNATIVES <br /> 41 GROUNDWATER AND SOIL REMEDIATION GOALS <br /> Based on the R 3CA analysis conducted in Section 3 0, remediation of soil and groundwater <br /> beneath the Site is necessary for protection of human health Risk-based cleanup levels for the <br /> Site are the SSTLs presented in Table 8 Remediation alternatives for the Site are evaluated for <br /> economic feasibility based on these SSTLs The objective of this remediation is removal and/or <br /> in-situ destruction of hydrocarbons in soil and groundwater to below risk-based cleanup levels <br /> 4.2 EVALUATION OF REMEDIAL ALTERNATIVES <br /> SECOR evaluated several technologies to remediate hydrocarbons in soil and groundwater at the <br /> Site Only alternatives that would address both soil and groundwater were evaluated The <br /> considered alternatives, estimated time line to closure, and respective costs are as follows <br /> 1) Groundwater Extraction with Soil Vapor Extraction - Operation of a SVE system would <br /> require approximately 2 years, but operation of a groundwater extraction system could <br /> require up to 10 years <br /> Task Unit Cost Total Cost <br /> Design and Permitting $5,000 $5,000 <br /> Equipment Purchase/Rental $35,000 $35,000 <br /> System Installation (incl wells) $45,000 $45,000 <br /> Operations & Maintenance (10 yrs) $18,000/year $180,000 <br /> Monitoring & Sampling (10 yrs) $9,000/year $90,000 <br /> Well Destruction/Site Restoration $20,000 $20,000 <br /> Total $375,000 <br /> Tmie 0&l\Lockeford\CAP wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.