My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007116
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:18 AM
Creation date
9/5/2019 1:34:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007116
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrective Action Plan 20 <br /> Time Oil Company Property No 04-049 14000 Last Highway 88 Lockeford CA September 8 1998 <br /> 6.0 IMPLEMENTATION SCHEDULE <br /> A schedule for the tasks described in Section 5 0 is discussed in this section The schedule is <br /> based upon timely review and approval of documents by regulatory agencies and assumes that <br /> there will be no prolonged delays to procure construction and operational permits Any delays <br /> will be documented and modifications to the schedule due to the delays will be reported in <br /> quarterly activity reports <br /> It is estimated that implementation of the CAP will require approximately twenty (20) weeks to <br /> complete based on the following estimates and assumptions <br /> SJCPHS-EHD approval of the CAP 2 weeks <br /> Public Comment Notification 4 weeks <br /> Permitting 4 weeks <br /> Equipment Procurement 4 weeks <br /> Installation, troubleshooting, and system startup 6 weeks <br /> Total Estimated Time For Project 20 weeks <br /> Time Othl-ockeford\CAP wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.