Laserfiche WebLink
Corrective Action Plan 20 <br /> Time Oil Company Property No 04-049 14000 Last Highway 88 Lockeford CA September 8 1998 <br /> 6.0 IMPLEMENTATION SCHEDULE <br /> A schedule for the tasks described in Section 5 0 is discussed in this section The schedule is <br /> based upon timely review and approval of documents by regulatory agencies and assumes that <br /> there will be no prolonged delays to procure construction and operational permits Any delays <br /> will be documented and modifications to the schedule due to the delays will be reported in <br /> quarterly activity reports <br /> It is estimated that implementation of the CAP will require approximately twenty (20) weeks to <br /> complete based on the following estimates and assumptions <br /> SJCPHS-EHD approval of the CAP 2 weeks <br /> Public Comment Notification 4 weeks <br /> Permitting 4 weeks <br /> Equipment Procurement 4 weeks <br /> Installation, troubleshooting, and system startup 6 weeks <br /> Total Estimated Time For Project 20 weeks <br /> Time Othl-ockeford\CAP wpd <br />