Laserfiche WebLink
COricct1Ve Action Plan «� <br /> Time Oil Company PropeNo 04-049 14000 East Highway 88,Lockeford CA September 8 1998 <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Elevation Contour and Dissolved Hydrocarbon Concentration Map - <br /> April 27, 1998 <br /> Figure 4 Site Plan with Cross-Section Locations <br /> Figure 5 Generalized Geologic Cross-Sections A-A' and B-B' <br /> Figure 6 Horizontal Extent of TPHg in Soil <br /> Figure 7 Site Plan with Estimated SVE Radius of Influence <br /> Figure 8 Process Flow Diagram <br /> Figure 9 Proposed Compound and Underground Piping Locations <br /> LIST OF TABLES <br /> Table 1 Groundwater Potentiometric Elevations <br /> Table 2 Groundwater Sample Analytical Results <br /> Table 3 Soil Sample Analytical Results <br /> Table 4 Well Construction Details <br /> Table 5 SVE Feasibility Study - Influent Air Analytical Results (March 1998) <br /> Table 6 SVE Feasibility Study - Mass Removal Estimates (March 1998) <br /> Table 7 Comparison of Site-Specific Concentrations to Tier 1 Risk-Based Screening Levels <br /> (RBSLs) <br /> Table 8 Comparison of Site-Specific Concentrations to Tier 2 Site-Specific Target Levels <br /> (SSTLs) <br /> LIST OF APPENDICES <br /> Appendix A Drilling Logs and Well Construction Specifications <br /> Appendix B Water Supply Well Search <br /> Appendix C Mass Calculations <br /> Appendix D RBCA Tool Kit Tier 2 Input/Output Sheets <br /> Time OiRl-ockeford%CAP wpd <br />