Laserfiche WebLink
Boring Log <br /> r (1 IEf T Nn 31-I 1 5 <br /> I'OR(Ivr No <br /> 0G G F7, R (MMM - — <br /> PROJECT NAME TIME OIL CO -SITE ASSESSMI IyT I O(-KFFORQ,C: <br /> BORING LOCATION WEST AREA OF FORMER TANK BED SURFACE ELE`/ Ips, 39 FFFT <br /> DRILLER JOEL STAPLETON SPECTRUM DRILL-ING DATE STNt�TEJ r3 30-92 _w GATE FINISHED 9-30-92 <br /> SAMPLE BLOW <br /> REF — WCf� ct S `SOIL DESCRIPTION o <br /> COUNT c1 o ! u , a ry <br /> € u� <br /> No TYPE INTERVAL Q r, 12 (En) J t"61 I (t5f) a AND REMARKS <br /> LijLD <br /> O FROM TO G 12 1S D <br /> k4 C5 400 415 11 25 21 IU • 40 5 Ir Sand (grain-sire becomes coarser Dy — <br /> 5P e I 415 <br /> I� 4a 0 f <br /> Bottom ut Boring it 40 5 Feet <br /> Bottom of `_jample Hole at 41 5 Feet <br /> 45 I 1 <br /> b ites <br /> E <br /> I 0E3EEnn wd, t7rElke Ailh d <br /> II truck--mnunlen CHE 550 drlll no <br /> SO I i I I `nuippen with d IU-Enr_h OD hollow-stem <br /> I I � nitgPr <br /> f i i <br /> I Upon C(tmple tion r)oitng was <br /> i unverted to d 4-inch diameter vapor <br /> J <br /> 55 extrdCtiun +eH (See well detail W-3) <br /> � <br /> s SdmplPr Type <br /> Cdlrtnrnld Sdmplel (CS) <br /> I I I) D 2 '✓ inches <br /> I I D 0 in( hPS <br /> F I i ,lanndr n PNneu umeter Sampler (SPT) <br /> I <br /> 1 j D ' ;) ncne,, <br /> D 1 Q1, Eng nr—s <br /> 1 <br /> 65 4 Gruund wdter N-js not encountered <br /> j riurEna drilling <br /> jl4l <br /> 1 E E <br /> 70 <br /> I <br /> I <br /> I , � <br /> 75— <br /> P 0 <br /> 5 A0 I I <br /> Pdge 2 u f 1 <br /> r <br />