My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007127
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:18 AM
Creation date
9/5/2019 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007127
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE REMEDIATION <br /> Soil Remediation System Construction <br /> Construction of a soil and groundwater remediation system was completed at the site in December <br /> 1999 The remediation system consists of seven soil vapor extraction (SVE) wells (W-1, W-3 <br /> through W-S),two groundwater monitor wells(MW-1 and MW-3) and four air sparge wells(AS-i <br /> through AS-4) with catalytic oxidation treatment A Site Plan depicting the Iocations of the <br /> remediation wells,subsurface piping,and rcmediation equipment compound is included as Figure 4 <br /> Initial start-up air discharge compliance testing was completed on December 13, 1999 The San <br /> Joaquin County Valley Air Pollution Control District(SJVAPCD)has approved an air permit for the <br /> site During site visits, SECOR monitored system parameters and collected appropriate influent soil <br /> vapor samples <br /> Based on the influent soil vapor samples analytical results, approximately 23,626 3 pounds of <br /> gasoline were removed and treated at an average extraction rate of 140 sefm for this reporting period <br /> The soil vapor analytical results and system efficiency results are included as Attachment III <br /> FORTHCOMING ACTIVITIES <br /> During the third quarter of 2000, SECOR will conduct additional monitoring, sampling and <br /> remediation system operation and maintenance activities The results of these activities will be <br /> summarized in a quarterly monitoring report to be submitted to you in October 2000 <br /> This report presents our understanding of existing conditions at the subject site The conclusions <br /> contained herein are based on the analytical results and professional judgment which are in <br /> accordance with current standards of professional practice, no other warranty is expressed or <br /> implied SECOR assumes no liability for exploratory borings or data reported by other consultants <br /> or contractors <br /> ��PED GEO� <br /> Sincerely, g S.80 <br /> O <br /> SECOR International Incorporated <br /> � l <br /> Todd J Brown John E Bower, R Gq <br /> Project Geologist Principal GeologistOFCAL�F°� <br /> TJB/JEB tb <br /> Attachments <br /> cc Harlin Knoll, San Joaquin County Public Health Services <br /> Elizabeth Thayer, California Regional Water Quality Control Board <br /> • C 1TIme OMLack-MrdQ200 3 SECOR <br /> 077 41737 003 duly 20 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.