Laserfiche WebLink
Ms Anastasia Duarte-Wilkinson <br /> July 23, 2003 <br /> Page 3 <br /> FORTHCOMING ACTIVITIES <br /> During the third quarter of 2003, SECOR will conduct additional monitoring,sampling and remediation system <br /> operation and maintenance activities The results of these activities will be summarized in a quarterly <br /> monitoring report to be submitted to you in October 2003 <br /> This report presents our understanding of existing conditions at the subject site The conclusions contained <br /> herein are based on the analytical results and professional judgment, which are in accordance with current <br /> standards of professional practice,no other warranty is expressed or implied SECOR assumes no liability for <br /> exploratory borings or data reported by other consultants or contractors <br /> Sincerely, <br /> SECOR International Incorporated �O <br /> Todd J Brown J Bower, R G '���CAL�pQ+ <br /> Associate Geologist Principal Geologist <br /> TJBIJEB sh <br /> Attachments Figure 1 —Site Location Map <br /> Figure 2—Groundwater Elevation Contour Map-- May 15, 2003 <br /> Figure 3—Dissolved Hydrocarbon Concentration Map—May 15, 2003 <br /> Figure 4—Site Plan Showing Remediation System Wells, Piping, and Treatment System <br /> Table 1 —Groundwater Potentiometric Elevations <br /> Table 2—Groundwater Sample Analytical Results <br /> Table 3—Groundwater Analytical Results For Fuel Oxygenates <br /> Attachment 1 — Field Data Sheets <br /> Attachment 2— Laboratory Analytical Report <br /> Attachment 3-- SVE System Performance Data <br /> cc Harlin Knoll, San Joaquin County Public Health Services <br /> Elizabeth Thayer, California Regional Water Quality Control Board <br /> I Mme OiIlLockefordlQMRslLockeford 02-03 doc SECOR International Incorporated <br />