Groundwater Elevation Data <br /> Depth to groundwater was obtained from the existing groundwater monitor wells at the site using a <br /> water level indicator graduated to 0 01 foot The depth to groundwater measurement was converted <br /> to a groundwater elevation for each well and used to construct a groundwater elevation contour map <br /> (Figure 2), and calculate the local groundwater flow direction and hydraulic gradient Groundwater <br /> at the site was measured at depths between 70 74 to 78 66 feet below ground surface (bgs) The <br /> groundwater potentiometric surface elevation averaged approximately 26 95 feet bgs during this <br /> monitoring event The groundwater elevation was adjusted approximately 2 75 feet since the last <br /> sampling event in March 2002 as a result of the wells being resurveyed The groundwater flow <br /> direction during this reporting period is toward the southwest with a hydraulic gradient of <br /> approximately 0 03 ft/ft A summary of data regarding groundwater levels measured through May <br /> 16, 2002 is presented in Table 1 Copies of field observations documenting work performed at the <br /> site are presented in Attachment I <br /> Groundwater Analytical Results <br /> The distribution of groundwater sample analytical results obtained from monitor wells at the site on <br /> May 16, 2002, is presented on Figure 3 and summarized in Table 2 The highest concentration of <br /> petroleum hydrocarbons is in the vicinity of monitor well MW-1 TPHg concentrations were below <br /> method detection limits (MDL) for all wells sampled during this monitoring event except MW-1 <br /> Benzene concentrations were below MDLs for all wells this quarter MTBE concentrations ranged <br /> • from 16 micrograms per litter(ug/L) in MW-4 to below method detection limits in monitor wells <br /> MW-1,MW-3, MW-6, MW-8 and MW-10 Attachment II contains photocopies of the laboratory <br /> analytical report and the chain-of-custody form <br /> LPH was not detected in MW-1 during this monitoring event and therefore the well was sampled <br /> LPH continues to be monitored and removed(if necessary)from MW-1 by hand bailing methods and <br /> the use of a passive,down-hole petroleum skimmer on a weekly basis A total of approximately 62 <br /> gallons of LPH has been removed from MW-1 since its detection in February 2000 <br /> Purge Water <br /> Purge water generated during groundwater purging is currently contained on-site in Department of <br /> Transportation rated 55-gallon drums pending removal to a disposal/recycling facility during <br /> SITE REMEDIATION <br /> Construction of a soil and groundwater remediation system was completed at the site in December <br /> 1999 The remediation system consists of seven soil vapor extraction (SVE) wells (W-1, W-3 <br /> through W-8), two groundwater monitor wells modified for SVE (MW-1 and MW-3) and four air <br /> sparge wells (AS-1 through AS-4) with catalytic oxidation treatment A Site Plan depicting the <br /> locations of the remediation wells, subsurface piping, and remediation equipment compound is <br /> included as Figure 4 Initial start-up air discharge compliance testing was completed on December <br /> 13, 1999 The San Joaquin County Valley Air Pollution Control District(SJVAPCD)has approved <br /> . an air permit for the site <br /> C Mme OiALockotordQ202 2 SECOR <br /> 770T 41737 00 0003 <br />