My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007163
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:19 AM
Creation date
9/5/2019 1:47:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007163
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE REMEDIATION <br /> Construction of a sort and groundwater remediation system was completed at the site in December <br /> 1999 The remediation system consists of seven soil vapor extraction (SVE) wells (W-1, W-3 <br /> through W-8), two groundwater monitor wells modified for SVE (MW-1 and MW-3) and four air <br /> sparge wells (AS-1 through AS-4) with catalytic oxidation treatment A Site Plan depicting the <br /> locations of the remediation wells, subsurface piping, and remediation equipment compound is <br /> included as Figure 4 Initial start-up air discharge compliance testing was completed on December <br /> 13, 1999 The San Joaquin County Valley Air Pollution Control District(SJVAPCD)has approved <br /> an air permit for the site During site visits, SECOR monitored system parameters and collected <br /> appropriate influent soil vapor samples <br /> Based on the influent soil vapor samples analytical results, approximately 1,858 pounds of gasoline <br /> were removed and treated at an average extraction rate of 189 scfm for this reporting period A total <br /> of approximately 31,539 pounds of gasoline has been removed and treated at the site since the SVE <br /> system began operation The soil vapor analytical results and system efficiency results are included <br /> as Attachment III <br /> FORTHCOMING ACTIVITIES <br /> During the second quarter of 2001, SECOR will conduct additional monitoring, sampling and <br /> remediation system operation and maintenance activities The results of these activities will be <br /> summarized in a quarterly monitoring report to be submitted to you in July 2001 <br /> This report presents our understanding of existing conditions at the subject site The conclusions <br /> contained herein are based on the analytical results and professional Judgment which are in <br /> accordance with current standards of professional practice, no other warranty is expressed or <br /> implied SECOR assumes no liability for exploratory borings or data reported by other consultants <br /> or contractors <br /> Sincerely, <br /> SECOR International Incorporated <br /> [ o <br /> No.E063 <br /> �E s <br /> r <br /> Todd J Brown kbit E Bower, R G OFC <br /> \ <br /> Project Geologist Principal Geologist <br /> TJBIJEB tb <br /> Attachments <br /> cc Harlin Knoll, San Joaquin County Public Health Services <br /> Elizabeth Thayer, California Regional Water Quality Control Board <br /> SECOR <br /> C Slime liefordQ101 � ApH 16 2001 <br /> 077 617377 003 OOJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.