Laserfiche WebLink
Project TIME OIL COMPANY - 14000 Highway 88, Lockeford Log of Boring/Monitonag Well Page 2 of 2 <br /> oring Location NW Entry Off HWY 88 Project No N0005-001-01 <br /> SimSB-6 <br /> ,bcontractor and Equipment GEO- Environmental E40SK-i LogB� Bi" Bower <br /> Sampling 1[cthod 2' l D SPI <br /> Spoon Monitoring Device Model 5808 OVM Comments <br /> ameter <br /> tart Date/7ime 12/2/93//1840 Finish Date/Time 12/2/93//1815 Hollow–StemOutside �Augers <br /> First, hater (BGS) NA Stabilized Water Level (BGS) NA <br /> $ Surface Elevation Casing Top Elevation <br /> 11 1 1 8 Boring Abandonment/ <br /> LITHOLOGIC DESCRIPTION Well Construction Details <br /> A. (color, grain size, consistency, moisture, other) <br /> 30 <br /> 6 <br /> 26 0 31 CLAYEY SILT, MODERATE YELLOWISH BROWN, <br /> 32 ML (lOYR 5/4), VERY STIFF, DRY NO - <br /> PETROLEUM ODOR <br /> 33 x <br /> 34 '- <br /> 35 -__-__- SAND, FINE TO MEDIUM GRAINED, YELLOWISH GRAY, <br /> 22 = (6Y 7/2), VERY DENSE, DRY, NO PETROLEUM i A <br /> 338 <br /> 8 0 36 _M ODOR <br /> 37 - C] <br /> 38 =SP - <br /> 39 <br /> v 11 40 <br /> I 16 0 <br /> 1 20 41 END OF BORING 416 FEET <br /> 42 <br /> 43 <br /> 44 <br /> 45 <br /> 46 <br /> i <br /> 47 <br /> 48- <br /> 49 <br /> 50 <br /> Reviewed by Date <br /> SE A C O R i� Revised by Date <br />