My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007177
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
ARCHIVED REPORTS_XR0007177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:19 AM
Creation date
9/5/2019 1:48:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007177
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 CURRENT SITE STATUS <br /> Currently, the monitoring well network at the site consists of 10 wells (MW-1 through MW-10), <br /> which are sampled on a quarterly basis Each well is sampled for the presence of TPHg by <br /> EPA Method 8015M, and for BTEX and fuel oxygenates (MtBE, TAME, DIPE, EtBE, and TBA) <br /> by EPA Method 8260B Groundwater monitoring and sampling activities have been performed <br /> at the site since January 1995 <br /> As detailed in Section 3 2, an SVEIAS system had continuously operated at the site from <br /> December 1999 through September 2003, at which time the remediation system was shut down <br /> due to low soil vapor influent concentrations The SVEIAS system was restarted on June 14, <br />' 2004, and operated intermittently through November 2004 With the approval of SJCEHD, the <br /> SVEIAS system was shut down on November 19, 2004 Operation of the SVEIAS system from <br /> December 1999 through November 2004 has resulted in the estimated removal and treatment <br />' of approximately 38,894 2 pounds of TPHg and 233 2 pounds of benzene from beneath the site <br /> (Table 6) <br /> i Removal of LPH from well MW-1 has not been performed since July 2002 due to the minimal <br /> quantity of LPH observed in the well LPH was last present in well MW-1 during the October <br /> 2003 (0 01 feet LPH), January 2004 (0 02 feet LPH), and April 2004 (<0 01 feet LPH) quarterly <br /> monitoring events (Table 7) <br /> 1 <br /> i <br /> i <br /> Time Oil Asmt&SCM Bloc 10 March 17,2005 <br /> 770T 41658 00 0015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.