Laserfiche WebLink
Project TIME OIL CO — 14000 E HWY 88 -- Lockeford Log of Boring/Monitoring well Page l of 3 <br /> Boring Location In Grass 10' West of Propane Tank Project No N0005-00t-01 MW- 5 (SB— 1 1 <br /> Subcontractor and Equipment Geo - Environmental Logged By Bartee <br /> Sampling Method 2 I D Split Spoon Monitoring Device PID Comments <br /> Start Date/Tine 12/27/94//0725 Finish Date/Time 12/27/94//1835 a-Inch Diameter Hollow <br /> First Water ($GS) NA Stabilized Water Level (BGS) NA Stem Augers <br /> C S p Surface Elevation NA Casing Top Elevation NA <br /> as Boring Abandonment/ <br /> es o7 LITHOLOGIC DESCRIPTION well Construction Details <br /> 0 7 (color grain size consistency moisture other) <br /> a <br /> 1 <br /> n <br /> n <br /> 2 ^ NOTE NO SPLIT SPOON SOIL SAMPLES COLLLECTED FROM <br /> 0 TO 25 FEET BELOW GROUND SURFACE BORING <br /> LOGGED FROM DPILL CUTTINGS FOR THIS INTERVAL <br /> n <br /> 4 n <br /> n <br /> n <br /> 6 <br /> n <br /> 7 n <br /> FINE SAND, MODERATE YELLOWISH BROWN (10YR 5/4) <br /> /\ MOIST NO PETROLEUM ODOR <br /> 9 SW <br /> 10 <br /> n <br /> 1 1 n PORTLAND <br /> CEI@IT <br /> GROUT <br /> • 12 <br /> n <br /> 13 n <br /> n <br /> 14 <br /> 15 n <br /> n <br /> 16 <br /> 17 <br /> n <br /> n <br />' 18 <br /> n <br /> 19 n <br /> n <br /> 20 n <br /> I'1 <br /> n <br /> 21 n <br /> 22-^n <br /> n <br /> 23-/,\ <br /> 24 <br /> n <br /> 25 n <br /> n <br /> 26 <br /> n i <br /> 27 <br /> n I i <br /> n <br /> 28 <br /> 29 <br /> 10 <br /> 30 lam. <br /> SEC 0 R Reviewed by Date y 9 <br /> Revised by Date <br />