My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18633
>
2900 - Site Mitigation Program
>
PR0016245
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 2:05:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0016245
PE
2951
FACILITY_ID
FA0004588
FACILITY_NAME
CLEMENTS AUTO SERVICE
STREET_NUMBER
18633
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227
APN
01924030
CURRENT_STATUS
02
SITE_LOCATION
18633 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/82/1993 16: 18 FROM ROGER FOo77 ASS .WSAC TO 12094640138': P.04 <br /> i <br /> . Mr.John Prtlloc <br /> .Tune 2, 1993 <br /> Page 3- <br /> Quality Assurance/Qualiry Control <br /> QA/QC_goals will be met through use of Chain of Custody Protocol,use of a <br /> Cal EPA-certified laboratory and their internal QA/QC procedures. <br /> The proposed investigation will follow protocols approved by SJ ISD. The <br /> proposed boring will be drilled after appropriate per nits are*ved by SJLHD. The <br /> work will be conducted under the direction of Andrew Lush,a California Registered <br /> Geologist(RG 4421),who is experienced-.in assessment and remediation of soil and <br /> groundwater contamination. <br /> SCT��ULE <br /> We plan to begin work immediately after our work plan is approved. We <br /> anticipate that the'drilling.sampling,and laboratory analysis will take about two <br /> . � <br /> weeks. A report Should be available two weeks after completion o£(yield arefivities. <br /> Please call if you.have any questions regarding the proposed investiga on. � <br /> With your approval,a copy of this work plan will tw,forwarded to Ibis.Margaret <br /> Lagorio of the SJLHD for approval prior to the beginning of field work. <br /> Sincerely, <br /> ROGER FOOTT ASSOCIATES,INC. <br /> Karla Sanders <br /> Staff Geologist <br /> Andrew P.Lash # No.4421 <br /> Senior Geologist <br /> KS:g m " crate <br /> Attachment Figure 1 -Site Location Ma <br /> Figure 2-Generalized Site Plan <br /> 1 <br /> I <br /> 1 <br /> KC7G f R <br /> 312.001 FC �T T <br /> ASS0 `rA 7f.4 <br /> `a <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.