Laserfiche WebLink
06/02/1993 16=20 FROM ROGER FOOTT ASS WSAC TO 1209464,0138 P.IDS <br /> Inc.and may choose to audit any site for compliance and take appropriate action to <br /> correct deficiencies. The Project Manager is responsible for implementing the <br /> provis ons of this HSP,providing a copy of this HSP to the field personnel,and <br /> advising personnel used on health and safety matters. The Project Manager and field <br /> geologist have the authority to audit site activities for compliance with the provisions <br /> of this HSP and may suspend or modify work practices or dismiss subcontractors <br /> whose conduct does not meet the re€Iuirements specified in this HSP. <br /> The Project Manager and field geologist are responsible for the dissemination <br /> of the information contained in this HSP to Roger Foott mates,W.,personnel <br /> assigned to the prey and to the re:spowible representative of each subcontractor <br /> farm working under Roger Foott Associates,Inc.,on the project. The field geologist <br /> will act as the Site Safety Officer:As such,the field geologist is Azle for <br /> adequately addressing the folkwAng items: <br /> • Safety supplies and equipment inventory onsite <br /> Training programs and hazard communicaticm <br /> Procedures for reporting accidents or incidents <br /> - Decontamination and contarnination-reduction procedures <br /> The field geologist has the authority to suspend work any time he or sbe Ends <br /> that the provisions of the HSP are inadequate for worker safety. The field geologist <br /> will promptly inform the Project Manager and the Health and Safety coordinator of <br /> any deficiency within the HSF or individuals or subcotntraaton whose conduct is not <br /> consistent with the requirements of this HSP. <br /> SAFEW AND ORIENTATION MEEMG <br /> Field personnel from Roger Foott Associates,Inc.,mid its subcontractors will <br /> attend a project-specific training meeting for safety issues and review the project <br /> tasks before beginning warp. The meeting will be led-by the field geologist, <br /> HAZARDOUS MATERL41 S PRESENT <br /> Previous work at the site has shoynt that a portion of the site's subsurface said <br /> has been contaminated with hydrocarbons,specifically leaded gasoline. <br /> FiQC FR <br /> 3124DOISSF -2- T T <br />