My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18633
>
2900 - Site Mitigation Program
>
PR0016245
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 2:05:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0016245
PE
2951
FACILITY_ID
FA0004588
FACILITY_NAME
CLEMENTS AUTO SERVICE
STREET_NUMBER
18633
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227
APN
01924030
CURRENT_STATUS
02
SITE_LOCATION
18633 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. John Pollock "' <br /> _ June 2, 1993 .- <br /> Page 3 <br /> uali 'Assurance uali . Control <br /> QA/QC goals will be-met through use of Chain of Custody protocol, use of a <br /> Cal EPA-certified laboratory and their internal QA/QC procedures. <br /> The proposed„investigation will follow protocols approved by SJLHD: The <br /> -:proposed boring will be drilled after-appropriate_permits are issued by SJLHD. The <br /> work will be conducted'under the direction of Andrew Lush, a California Registered. <br /> Geologist (RC-T4421),who is experiencedib assessment and remediation of soil and <br /> groundwater contamination. <br /> SCHEDULE <br /> We plan to begin work immediately after-our,work plan is approved. We <br /> anticipate that the drilling,, sampling, and laboratory analysis will take about two <br /> weeks. A report should be available two weeks after completion of field activities. <br /> Please'cali if-you,have any questions regarding.the proposed investigation. <br /> With your approval; a copy of this work plan will be forwarded to Ms. Margaret <br /> Lagorio of the SJLHD for approval prior to the beginning of field work. <br /> Sincerely, <br /> -ROGER FOOTT ASSOCIATES, INC.- <br /> Karla <br /> NC:Karla Sanders aEp <br /> Staff Geologist y�E opo - <br /> _ - � ♦ Qp�W A 4Gn �., <br /> .'r <br /> Andrew?. Lush _ No. 442i � <br /> Senior Geologist' �''y ' <br /> KS:gm <br /> - T�9rf OF CAL1��4�`R <br /> Attachme-nt Figure I -'Site_.Locatiori Map <br /> Figure 2 - Generalized Site Plan <br /> - KpGEIt <br /> X12.001 FMTT <br /> A.SSoCjA7ES <br />
The URL can be used to link to this page
Your browser does not support the video tag.